![Miller AG-BAG G6060 Скачать руководство пользователя страница 29](http://html1.mh-extra.com/html/miller/ag-bag-g6060/ag-bag-g6060_operators-manual_1796046029.webp)
23
Moving Tow Hitch To Bagging Position
1.
Crank the lift jack up and remove lift jack from the tow hitch.
2.
Remove the hair pin and retaining pin holding the tow hitch in the transport position.
3.
Using the grab handles, slide the tow hitch out of the transport socket location. Relocate the
tow hitch to the hitch socket located directly below the gearbox. Slide the tow hitch in until
the holes line up and secure in place with the retaining pin and hair pin. Be sure tow hitch is
securely pinned in position.
Moving The Second Wheel
1.
Insert the lift jack into the socket located on the wheel strut at the right side of the bagger.
Jack the bagger up until the wheel (inside the tunnel) is off the ground.
2.
Pull the retaining pin and remove the entire wheel assembly from the mounting socket located
inside the tunnel.
3.
Insert the wheel assembly into the socket located next to the lift jack. Insert the retaining pin
and secure the pin in place with the hair pin.
4.
Raise the lift jack so the wheel is touching the ground. Remove the lift jack from the socket.
5.
Return the lift jack to the tow hitch. Crank the lift jack down and raise the jack stand (located
next to the hydraulic reservoir) and pin in the raised position.
Wheel
Socket
Wheel Assembly
Tow Hitch
Lift Jack
Socket
Grab Handle
Tunnel
Hitch Socket
Gearbox
Содержание AG-BAG G6060
Страница 5: ...3 This Page Intentionally Left Blank...
Страница 88: ...82 This Page Intentionally Left Blank...
Страница 90: ...2013 by Miller St Nazianz Inc...