OM-229 253 Page 27
4-15. Placing Jumper Links
Ref. 802 295
Tools Needed:
3/8 in.
2
Do not overtighten
jumper link nuts.
1
!
Disconnect and lockout/tag-
out input power before
installing or moving jumper
links.
Check input voltage available at
site.
1
Jumper Link Label
Check label
−
only one is on unit.
2
Jumper Link
Move jumper links to match input
voltage, and label on unit.
Close and secure access door, or
go on to Section 4-16.
Содержание Subarc DC 1000
Страница 14: ...OM 229 253 Page 10...
Страница 36: ...OM 229 253 Page 32 SECTION 7 ELECTRICAL DIAGRAM Figure 7 1 Circuit Diagram...
Страница 37: ...OM 229 253 Page 33 236 683 A...
Страница 44: ...Notes...
Страница 45: ...Notes...
Страница 46: ...Notes...