DecalMATE
MM112-003 - Operator Manual
28
E
F
G
H
3. Put the tank into the position indicated by the software (number 1 in this case). Select the reagent in the
drop-down menu. Press Done to confirm and return to the REAGENT CONFIGURATION screen.
I. Put the tank in its holder position
J. Check the level (working label)
K. Close the tanks door
I
J
K
Repeat the same procedure to fill all other tanks.
4. If a tank is not loaded with reagent, DO NOT FILL THE TANK.
5. When loading of reagents needed is completed and tanks repositioned, close the tanks doors.
6. Now the unit is ready to process.
After replacement, make sure that the tank fitting is correctly inserted in its relative
housing, the tank should be aligned to the others.
At the end of the procedure, it is possible to check the correspondence between the tanks
as diplayed by the software, with their numbers, names and colours, and the real tanks as
positioned in the holder.
MAX
MIN
Содержание DecalMATE
Страница 1: ...DecalMATE Automatic Fixation Decalcification System OperatorManual MM112...
Страница 2: ......
Страница 50: ...DecalMATE MM112 003 Operator Manual 50 1 2 3 4 5 6 7 8 9 10...
Страница 75: ......
Страница 76: ......
Страница 77: ......
Страница 78: ......
Страница 79: ......