46
Meter Operations
3.6.5
3.6.5
powEr DEManD
The Power Demand page shows the power
averaged over a demand interval for active,
reactive and apparent power as shown in Fig 57.
Please see section B.1 in Appendix B for details.
Fig 57 : Power Demand page
Fig 58 : Power Demand Setup page
TouCH BuTTon funCTions:
• to jump to the Power Demand setup page
as shown in Fig 58, touch the set (f2)
button.
• to jump to the Maximum Power Demand
page, touch the MaX (f4) button.
• otherwise, touch the bacK (f1) button to
return to the PoWer sub-menu.
TouCH BuTTon funCTions:
• to input new settings, touch the set (f4)
button.
• otherwise, touch the bacK (f1) button to
return to the PoWer sub-menu.
In the input mode, the uP (f2) and DoWn (f3)
buttons will become active and the background
colour of the active field will be changed to white.
Demand interval can be set from 60 secs to 1800
secs in steps of 60 secs whereas the number of
sub interval blocks can be set from 2 to 120.
Содержание DPM680
Страница 1: ......
Страница 71: ...71 Fig 83 Energy and Power webpage display Webpage Operations 4 2...
Страница 73: ...73 Fig 84 Energy and Power webpage display Webpage Operations 4 3...
Страница 78: ...78 Table A 1 Specification list Appendix A...
Страница 79: ...79 Table A 1 Specification list Appendix A...
Страница 80: ...80 Table A 1 Specification list Appendix A...
Страница 84: ......