Initial commissioning
24
Risk of injury or damage to prop-
erty due to improper installation.
Incorrect installation of the tumble
dryer can lead to personal injury or
damage to property.
Before commissioning the tumble
dryer for the first time, make sure it
has been installed and connected
correctly. See “Installation”.
Damage caused by switching the
appliance on too soon.
This can damage the heat pump in
the tumble dryer.
After setting up the tumble dryer,
wait for at least one hour before
switching it on.
Follow all the steps required for initial
commissioning.
During the commissioning process,
you will need to define the settings for
daily use of the tumble dryer. Some of
the settings can only be configured
during the initial commissioning pro-
cess. After that, they must be changed
by Miele Service.
These settings are also described under
“Supervisor level”.
Switch on the tumble dryer
Press the
control.
The welcome screen will light up.
Setting the language
You will be asked to select the language
you require for the display. You can
change the language at any time (see
“Language” under “Supervisor level”).
deutsch
Language
OK
english (AU)
english (CA)
english (GB)
español
english (US)
Scroll to the left or the right until the
language you want appears.
Touch the sensor for the language
you want.
The selected language will be high-
lighted in orange and the display will
change to the next setting.
Содержание PDR 908 HP Marine
Страница 104: ......
Страница 105: ......
Страница 106: ......
Страница 108: ...M Nr 11 257 550 00 en GB PDR 908 HP Marine ...