Indoor unit installation
Installation
91
Face the concave side of the installation hooks toward the expansible hooks. Determine the length of the
installation hooks from the height of ceiling, then cut off the unnecessary part.
If the ceiling is extremely high, please determine the length of the installation hook depending on the real
situation.
3.4.4 Install the main body
Make the 4 suspender through the 4 hanger of the main body to suspend it. Adjust the hexangular nuts on
the four installation hooks evenly, to ensure the balance of the body. Use a leveling instrument to make sure
the levelness of the main body is within
±
1
°
.
Adjust the position to ensure the gaps between the body and the four sides of ceiling are even. The body's
lower part should sink into the ceiling for 10~12 mm. In general, L is half of the screw length of the
installation hook.
Locate the air conditioner firmly by wrenching the nuts after having adjusted the body's position well.
3.4.5 Install the panel
Remove the grille
Содержание U2MRS-12
Страница 6: ...Dimensions 12 Indoor Units 2 Dimensions Model A H 18 K 205 235 24 K 30 K 245 275 36 K 245 275 205 235...
Страница 7: ...Service Space Indoor Units 13 3 Service Space 1000mm 1000mm 1000mm 1000m m...
Страница 13: ...Field Wiring Indoor Units 19 9 Field Wiring...
Страница 20: ...Wiring Diagrams 26 Indoor Units 4 Wiring Diagrams 12K 12K 24K 30K 36K...
Страница 21: ...Wiring Diagrams Indoor Units 27 MTB 24HWDN1 QRC4...
Страница 28: ...Field Wiring 34 Indoor Units 10 Field Wiring 12K 18K 24K 30K 36K...
Страница 32: ...Service Space 38 Indoor Units 3 Service Space...
Страница 34: ...Wiring Diagrams 40 Indoor Units 36K...
Страница 37: ...Indoor Units 43 9 Field Wiring...
Страница 40: ...Dimensions 46 Indoor Units 2 Dimensions...
Страница 41: ...Service Space Indoor Units 47 3 Service Space...
Страница 42: ...Wiring Diagrams 48 Indoor Units 4 Wiring Diagrams 12K 18K...
Страница 46: ...52 Indoor Units 10 Field Wiring 12K 18K...
Страница 48: ......
Страница 51: ...Dimensions Console Type 57 2 Dimensions MFAU 12HRFN1 QRC8 MFA 16HRFN1 QRC8...
Страница 52: ...Service Space 58 Console Type 3 Service Space...
Страница 53: ...Wiring Diagrams Console Type 59 4 Wiring Diagrams MFAU 12HRFN1 QRC8 MFA 16HRFN1 QRC8...
Страница 58: ...Field Wiring 64 Console Type 10 Field Wiring MFAU 12HRFN1 QRC8 MFA 16HRFN1 QRC8...
Страница 64: ...Wiring Diagrams 70 Outdoor Units 4 Wiring Diagrams U2MRS 12...
Страница 65: ...Wiring Diagrams Outdoor Units 71 18K 24K 30K 36K...
Страница 66: ...Wiring Diagrams 72 Outdoor Units...
Страница 67: ...Wiring Diagrams Outdoor Units 73...
Страница 92: ...Refrigerant pipe installation 98 Installation...
Страница 123: ...Troubleshooting Electrical Control System 129 2 4 1 2 Outdoor unit malfunction...
Страница 130: ...Troubleshooting 136 Electrical Control System 2 4 2 3 Up down panel is not closed...
Страница 132: ...Troubleshooting 138 Electrical Control System 2 4 4 For the outdoor unit 2 4 4 1 E0 malfunction...
Страница 134: ...Troubleshooting 140 Electrical Control System 2 4 4 3 E3 malfunction...
Страница 135: ...Troubleshooting Electrical Control System 141 2 4 4 4 E4 malfunction...
Страница 138: ...Troubleshooting 144 Electrical Control System 2 4 4 7 E6 malfunction Only for MOU 36HFN1 QRC4 MOU 36HFN1 QRC8...
Страница 141: ...Troubleshooting Electrical Control System 147 2 4 4 9 P1 malfunction For 36k models...
Страница 142: ...Troubleshooting 148 Electrical Control System 2 4 4 10 P2 malfunction For 36k models...
Страница 143: ...Troubleshooting Electrical Control System 149 2 4 4 11 P3 malfunction...