background image








17. Decommissioning

Before carrying out this procedure, it is essential that the technician is completely familiar
with the equipment and all its detail. It is recommended good practice that all refrigerants
are recovered safely. Prior to the task being carried out, an oil and refrigerant sample shall
be taken.

In case analysis is required prior to re-use of reclaimed refrigerant. It is essential that 
electrical power is available before the task is commenced.
a) Become familiar with the equipment and its operation.
b) Isolate system electrically
c) Before attempting the procedure ensure that:
   mechanical handling equipment is available, if required, for handling refrigerant cylinders;
   all personal protetive equipment is available and being used correctly;
   the recovery process is supervised at all times by a competent person;
   recovery equipment and cylinders conform to the appropriate standards.
d) Pump down refrigerant system, if possible.
e) If a vacuum is not possible, make a manifold so that refrigerant can be removed from
    various parts of the system.
f) Make sure that cylinder is situated on the scales before recovery takes place.
g) Start the recovery machine and operate in accordance with manufacturer s instructions.
h) Do not overfill cylinders. (No more than 80% volume liquid charge).
i) Do not exceed the maximum working pressure of the cylinder, even temporarily.
j) When the cylinders have been filled correctly and the process completed, make sure that
   the cylinders and the equipment are removed from site promptly and all isolation valves
   on the equipment are closed off.
k) Recovered refrigerant shall not be charged into another refrigeration system unless it has
    been cleaned and checked.

16. Charging procedures

In addition to conventional charging procedures, the following requirements shall be followed:
    Ensure that contamination of different refrigerants does not occur when using charging
    equipment. Hoses or lines shall be as short as possible to minimize the amount of
    refrigerant contained in them.
    Cylinders shall be kept upright.
    Ensure that the refrigeration system is earthed prior to charging the system with refrigerant.
    Label the system when charging is complete(if not already).
    Extreme care shall be taken not to overfill the refrigeration system.
    Prior to recharging the system it shall be pressure tested with OFN. The system shall be
    leak tested on completion of charging but prior to commissioning. A follow up leak test
    shall be carried out prior to leaving the site.

   

,

When the final OFN charge is used, the system shall be vented down to atmospheric pressure 
to enable work to take place. This operation is absolutely vital if brazing operations on the 
pipe-work are to take place.
Ensure that the outlet for the vacuum pump is not closed to any ignition sources and there 
is ventilation available.

Information

 Servicing 

 

Page 31

 

Содержание MOB01-09HFN8-QRD6GW

Страница 1: ...Installation Manual Mission Series R410a Models R32 Models...

Страница 2: ...ions 11 b Outdoor Unit Types and Specifications 12 c Notes on Drilling Hole in Wall 13 Table of Contents Installation Manual 1 2 5 3 4 6 Drainpipe Installation 14 Outdoor Unit Installation 11 Indoor U...

Страница 3: ...cuation 24 Test Run 27 13 A Notes on Pipe Length and Elevation 17 a Outdoor Unit Wiring 20 b Indoor Unit Wiring 21 c Power Specifications 22 d Wiring Diagram 23 Caution Risk of fire for R32 B Refriger...

Страница 4: ...oning system comes with the following accessories Use all of the installation parts and accessories to install the air conditioner Improper installation may result in water leakage electrical shock an...

Страница 5: ...em has a leak detection system installed it must be checked for leaks at least every 12 months 5 When the unit is checked for leaks proper record keeping of all checks is strongly recommended national...

Страница 6: ...Page 6 Installation Overview 3 Unit Installation Overview INSTALLATION ORDER...

Страница 7: ...y fall causing personal injury unit and property damage or death CAUTION Indoor Unit Installation Install the indoor and outdoor units cables and to prevent static or image distortion Depending If the...

Страница 8: ...Page 8 Indoor Unit Installation 4...

Страница 9: ...Page 9 Indoor Unit Installation 4 For MSMBAU 09HRFN1 QRD0GW For MSMBBU 12HRFN1 QRD0GW For MSMBCU 18HRFN1 QRD0GW For MSMBDU 24HRFN1 QRD0GW...

Страница 10: ...Page 10 Indoor Unit Installation 4...

Страница 11: ...re the awning does not obstruct airflow The installation area must be dry and well ventilated There must be enough room to install the connecting pipes and cables and to access them for maintenance Th...

Страница 12: ...m deforming Do not touch the fan with hands or other objects Do not lean it more than 45 and do not lay it sidelong Make concrete foundation according to the specifications of the outdoor units Fasten...

Страница 13: ...8 0 0 W 5 1 4 W 1 815 W3 333 D 70 W2 H H1 H2 D1 D2 D3 62 B1 20 A1 61 6 A2 For MOB02 18HFN1 QRD0GW Page 13 Outdoor Unit Installation Instructions...

Страница 14: ...For MOCA02 24HFN1 QRD0GW Page 14 Outdoor Unit Installation Instructions...

Страница 15: ...n joint to redirect water from the unit during heating mode NOTE Make sure the water drains to a safe location where it will not cause water damage or a slipping hazard Seal Drain joint A B Base pan h...

Страница 16: ...Drainpipe Installation 6 Page 16...

Страница 17: ...nd flammable Ensure there is no refrigerant leakage after completing the installation work Notes On Pipe Length and Elevation Ensure that the length of the refrigerant pipe the number of bends and the...

Страница 18: ...th PVC tape to prevent foreign materials from entering the pipe 2 Sheath the pipe with insulating material 3 Place flare nuts on both ends of pipe Make sure they are facing in the right direction beca...

Страница 19: ...en the high pressure pipe 1 When connecting the flare nuts apply a thin coat of refrigeration oil to the flared ends of the pipes 2 Align the center of the two pipes that you will connect Indoor unit...

Страница 20: ...er grounding wires Improper grounding may cause electrical shock DO NOT connect the unit with the power source until all wiring and piping is completed Make sure that you do not cross your electrical...

Страница 21: ...crimp the u lugs to the ends of the wires 2 Open the front panel of the indoor unit Using a screwdriver remove the cover of the electric control box on your indoor unit 3 Thread the power cable and t...

Страница 22: ...D VOLT CIRCUIT BREAKER FUSE A POWER Indoor Power Supply Specifications Outdoor Inverter Power Supply Specifications MODEL 09 12 18 24 MODEL 09 12 18 24 220 240V 220 240V 220 240V 220 240V 16A 16A 16A...

Страница 23: ...MONO unit for the standby control needs the cross section area of cable connected to W 1 L must be sufficient for the maximum system current The maximum system current is equal to the sum of indoor un...

Страница 24: ...ks will be identified at this pressure so you will not waste nitrogen and time It is also safer to find leaks at a lower pressure than the final test pressures Increase the pressure slowly to the stre...

Страница 25: ...n the vacuum for at least 15 minutes or until the NOTE If there is no change in system pressure unscrew the cap from the packed valve high pressure valve If there is a change in system pressure there...

Страница 26: ...to avoid extra refrigerant charged it may cause liquid hammer of the compressor or protections Use supplementing flexible pipe to connect refrigerant cylinder pressure gauge and outdoor unit And The r...

Страница 27: ...s being registered correctly d Ensure the indicators on the remote control and the display panel on the indoor unit work properly e Ensure the manual buttons on the indoor unit works properly f Check...

Страница 28: ...the risk of a flammable gas or vapour being present while the work is being performed The area shall be checked with an appropriate refrigerant detector prior to and during work to ensure the technic...

Страница 29: ...l components the casing is not altered in such a way that the level of protection is affected This shall include damage to cables excessive number of connections terminals not made to original specifi...

Страница 30: ...eak detection equipment shall be set at a percentage of the LFL of the refrigerant and shall be calibrated to the refrigerant employed and the appropriate percentage of gas 25 maximum is confirmed Lea...

Страница 31: ...pressure of the cylinder even temporarily j When the cylinders have been filled correctly and the process completed make sure that the cylinders and the equipment are removed from site promptly and a...

Страница 32: ...ignated for the recovered refrigerant and labelled for that refrigerant i e special cylinders for the recovery of refrigerant Cylinders shall be complete with pressure relief valve and associated shut...

Страница 33: ...equired to activate the warranty of the newly installed system Step 12 Perform the test operation in accordance with the installation manual to ensure all functions and parts are working correctly Ste...

Страница 34: ...es O F0 Overload current protection 2 times O F1 Outdoor ambient temperature sensor T4 open circuit or short circuit 3 times O F2 Condenser coil temperature sensor T3 open circuit or short circuit 4 t...

Страница 35: ...very Visit Inspect Clean Unit Air Filter s Every Visit Check unit for noise and vibration Every Visit Check Evaporator Coil for Dirt and Clean as required Every Visit Test Clean drain pump if fitted a...

Страница 36: ...including Mains Isolator Every Visit Check Unit Operation Voltage and record Every Visit V Check Unit Operation Current and record Every Visit A Check Compressor Run Hours Record Every Visit Hours Che...

Страница 37: ...work pressure tested Refer COP 8 Pipe work insulated secured covered 9 Evacuation to less than 2 Torr Refer COP 10 Open both L Line Suction valves 11 Pour 2 4 litres of water into the evaporator drain...

Страница 38: ...ber E Mail Address Site Reference Date Parts to Be Claimed Model No Serial No Components Including part numbers Suspected cause of failure Defective Product Collection Address Address County Region Po...

Страница 39: ...17 Old Park Lane London W1K 1QT Tel 44 0 2074 092009...

Отзывы: