MLCAC-UTSM-2010-10
Insulation Work
Installation
105
For construction convenience, before laying pipes, use insulation material to insulate the pipes to be deal with, at the same time, at two ends
of the pipe, remain some length not to be insulated, in order to be welded and check the leakage after laying the pipes.
3). Insulate for the jointing area, expanding area and the flange area
Insulate for the jointing area, expanding area and the flange area should be done after checking leakage of the pipes
Make sure there’s no clearance in the joining part of the accessorial insulation material and local preparative insulation material.
5.3 Drainage pipe insulation
1) The connection part should be insulated, or else water will be condensing at the non-insulation part.
5.4 Note
1) The jointing area, expanding area and the flange area should be heat insulated after passing the pressure test
2) The gas and liquid pipe should be heat insulated individually, the connecting part should be heat insulated individually.
3) Use the attached heat-insulation material to insulate the pipe connections (pipes’ tie-in ,expand nut ) of the indoor unit.
6. Wiring
Please refer to the Wiring Diagram.
Содержание MLCAC-UTSM-2010-10
Страница 1: ...MIDEA LCAC 50Hz R410A DC Inverter Service Manual 2011 ...
Страница 2: ......
Страница 4: ......
Страница 16: ...Service Space MLCAC UTSM 2010 10 12 Four way Cassette Type 3 Service Space ...
Страница 17: ...MLCAC UTSM 2010 10 Wiring Diagrams Four way Cassette Type 13 4 Wiring Diagrams MCC 36HRDN1 MCC 48HRDN1 ...
Страница 21: ...MLCAC UTSM 2010 10 The Specification of Power Four way Cassette Type 17 9 The Specification of Power ...
Страница 22: ...Field Wiring MLCAC UTSM 2010 10 18 Four way Cassette Type 10 Field Wiring Wiring chart ...
Страница 23: ...MLCAC UTSM 2010 10 Field Wiring Four way Cassette Type 19 ...
Страница 32: ...The Specification of Power MLCAC UTSM 2010 10 28 Duct Type 9 The Specification of Power ...
Страница 33: ...MLCAC UTSM 2010 10 Field Wiring Duct Type 29 10 Field Wiring ...
Страница 34: ...Field Wiring MLCAC UTSM 2010 10 30 Duct Type Air conditioner link circuit ...
Страница 37: ......
Страница 40: ...Service Space MLCAC UTSM 2010 10 58 Ceiling Floor Type 3 Service Space ...
Страница 41: ...MLCAC UTSM 2010 10 Wiring Diagrams Ceiling Floor Type 59 4 Wiring Diagrams MUB 36HRDN1 MUB 48HRDN1 ...
Страница 46: ...The Specification of Power MLCAC UTSM 2010 10 64 Ceiling Floor Type 9 The Specification of Power ...
Страница 47: ...MLCAC UTSM 2010 10 Field Wiring Ceiling Floor Type 65 10 Field Wiring ...
Страница 48: ...Field Wiring MLCAC UTSM 2010 10 66 Ceiling Floor Type ...
Страница 51: ...MLCAC UTSM 2010 10 Service Space Outdoor Units 69 2 Service Space ...
Страница 53: ...MLCAC UTSM 2010 10 Wiring Diagrams Outdoor Units 71 4 Wiring Diagrams MOUB 36HDN1 Q MOU 48HDN1 MOUB 36HDN1 R ...
Страница 54: ...Wiring Diagrams MLCAC UTSM 2010 10 72 Outdoor Units MOUB 48HDN1 R ...
Страница 60: ...Troubleshooting MLCAC UTSM 2010 10 78 Outdoor Units For Duct type ...
Страница 89: ...MLCAC UTSM 2010 10 Control Control 107 Part 5 Control 1 Controller 108 ...