![Middleby CROWN GL-30 Скачать руководство пользователя страница 9](http://html1.mh-extra.com/html/middleby/crown-gl-30/crown-gl-30_installation-and-operation-manual_1790436009.webp)
INSTALLATION AND OPERATION MANUAL, GAS KETTLE, MODEL GL-30
10156R2
9
2012-11-28
2.0 INSTALLATION
(Continued)
2.
208/240 VAC - 60 Hz - Single and Three Phase.
Units with this electrical rating are factory equipped with a transformer. To connect supply
wires remove cover from transformer box at right rear of unit. Route supply wires and
ground wire through the hole in the cover with a strain relief fitting. Connect wires to the
primary transformer terminals as required by your power supply voltage. Connect ground
wire to ground lug. Replace cover. Three-phase units are wired as above, using only two
supply wires. The third supply wire is not connected and must be properly terminated.
3.
220 VAC - 50 Hz - Single Phase.
Units equipped with this voltage rating should be wired exactly as in (2) above.
3.0 PERFORMANCE CHECK
The following items should be checked before or within the first 30 days of operation by a
qualified service technician.
1.
Verify correct gas type.
2.
Verify correct voltage, cycle and phase.
3.
Gas pressure.
4.
Internal gas connections.
5.
Internal electrical connections.
6.
Pilots - adjustment and ignition.
7.
Burners - adjustment and ignition.
8.
Thermostat - cycle for operation check.
9.
Supply valve - check for operation.
10. Check hinge and lid assembly.
11. Draw-off valve - check operation.
12. Advise user on cleaning procedures.