The following work should be completed in the office before you go to the future location of the device:
1. If necessary, create a customer on the myDatanet server (see "myDatanet Server Manual " 805002).
2. Within the selected customer create a new site/application (based on the "myDatalogEx" application)
for the operation on the myDatanet server (see "Creating the site" on page 61).
3. Configure the created site/application according to your requirements (see "Site configuration" on page
54).
4. Connect the antenna (see "Connecting the GSM antenna" on page 41).
5. To establish a connection, activate setup mode (see "Setup mode" on page 27) using the reed switch.
The myDatalogEx is supplied with the transport mode activated (measurement and transmission
"OFF") and should also always be stored in this state (see "Storage of the product" on page 22).
Activating setup mode deactivates transport mode and the myDatalogEx starts operation according to
the stored configuration settings.
Note:
You can also skip this step, as a connection should be established during the installation on site,
which transfers the configuration settings to the myDatalogEx at the same time.
6. Remove the antenna again.
The following tasks are to be completed on site, directly at the deployment site of the device:
7. Complete all of the steps detailed in the chapter "Connecting the sensor" on page 38.
8. If you intend to install the myDatalogEx in a shaft, you must check that the device can also establish a
GPRS connection in the final installation position when the manhole cover is closed before you leave
the worksite.
Proceed as follows during this process:
1. Place the device and the antenna in the final installation position (with the shaft lid open).
2. Activate setup mode using the reed switch (see "Setup mode" on page 27).
3. Wait until the symbol for connecting is displayed on the device.
4. Close the manhole cover.
5. Wait until it is indicated in the list of measurement instruments that the device is in setup mode.
This is indicated by a speech bubble with the "Setup" inscription. The speech bubble is hidden
again if setup mode was completed successfully. The background colour of the speech bubble
changes from white to red if a problem is detected. In both cases, this can take up to 8min. .
6. Open the site settings (see "Site configuration" on page 54) and click on "Setup data" to display
the GSM level determined during setup mode.
48
Rev. 05
Содержание myDatalogEx
Страница 2: ......
Страница 7: ...Chapter 2 Declaration of conformity Chapter 2 Declaration of conformity Rev 05 7 ...
Страница 8: ......
Страница 9: ...Chapter 3 Ex certification Chapter 3 Ex certification Rev 05 9 ...
Страница 10: ...10 Rev 05 ...
Страница 11: ...Chapter 3 Ex certification Rev 05 11 ...
Страница 12: ...12 Rev 05 ...
Страница 32: ......
Страница 46: ......
Страница 64: ......
Страница 68: ......
Страница 70: ......
Страница 78: ......
Страница 80: ......
Страница 82: ......