13
2.6 Rack- Mount Placement
Before mounting the Switch, please read the following instructions carefully,
Elevated
Operating
Ambient
If installed in a closed or multi-unit rack assembly, the operating
ambient temperature of the rack environment may be greater
than room ambient. Therefore, consideration should be given to
installing the equipment in an environment compatible with the
maximum ambient temperature (Tma) specified by the
manufacturer.
Reduced Air
Flow
Installation of the equipment in a rack should be such that the
amount of air flow required for safe operation of the equipment is
not compromised.
Mechanical
Loading
Mounting of the equipment in the rack should be such that a
hazardous condition is not achieved due to uneven mechanical
loading.
Circuit
Overloading
Consideration should be given to the connection of the
equipment to the supply circuit and the effect that overloading of
the circuits might have on overcurrent protection and supply
wiring. Appropriate consideration of equipment nameplate
ratings should be used when addressing this concern.
Reliable
Earthing
Reliable earthing of rack-mounted equipment should be
maintained. Particular attention should be given to supply
connections other than direct connections to the branch circuit
(e.g. use of power strips)."
To mount the Switch in any standard-sized, 19-inch wide, 1U high rack, please
follow these instructions:
Place the Switch on a hard flat surface with the front panel facing you.
Attach a rack–mount bracket to one side of the Switch with the supplied
screws. Then attach the other bracket to the other side. (
Figure 2.6.1
)
Figure 2.6.1
Содержание SP6824P
Страница 1: ...1 User s Manual 24 port 10 100Mbps Layer 2 Managed Switch With 370W PoE output power Model No SP6824P ...
Страница 20: ...20 3 2 3 LAG Group 3 2 4 PoE ...
Страница 21: ...21 ...
Страница 25: ...25 3 4 4 MSTP Port 3 4 5 MSTP Instance 3 4 6 MSTP Interface ...
Страница 26: ...26 ...
Страница 30: ...30 3 6 6 Storm Control 3 6 7 Management IP List ...
Страница 33: ...33 3 7 4 Rate Control 3 7 5 Port based QoS ...
Страница 36: ...36 3 9 2 LLDP Statistics 3 9 3 LLDP Information ...
Страница 37: ...37 3 9 4 Remote Information ...
Страница 39: ...39 3 10 4 Port Mirroring 3 10 5 Admin Timeout 3 10 6 Firmware Upgrade 3 10 7 Reboot 3 10 8 Save Configurations ...
Страница 40: ...40 3 10 9 Logs Settings 3 10 10 Log Server 3 10 11 Memort Logs 3 10 12 Flash Logs ...
Страница 42: ...42 3 10 18 BOOTP ConfigDownload ...
Страница 44: ...44 3 11 4 RMON Event log 3 11 5 RMON Alarm ...
Страница 45: ...45 3 11 6 RMON History ...
Страница 46: ...46 3 12 1 Help ...
Страница 47: ...47 3 13 1 Log out ...
Страница 77: ...77 Figure 4 1 shows the diagram of Straight Through Cables Figure 4 2 shows the diagram of Crossover Cables ...