Optical Strain Gages |
os3150 os3155
C o p y r i g h t © 2 0 1 3 M i c r o n O p t i c s , I n c .
o s 3 1 5 0 o s 3 1 5 5 I n s t a l l a t i o n G u i d e , R e v i s i o n C
6
Figure 9
– STOPAQ Paste Detail
Cut a piece of STOPAQ WrappingBand EZ 4 x 7 ½ inch [100 x 190mm]
Position STOPAQ over the gage and center as shown in Figure 10. Starting from the center and working
toward the edges, gently press the STOPAQ in place, forcing out any air. Firmly press STOPAQ in place
around the edges of gage.
Figure 10
– STOPAQ EZ Patch
Firmly press and kneed the STOPAQ around the perimeter of the gage to form a tight seal with the base
metal. Pay special attention to the area around the cable to ensure that it is sealed as shown in Figure 11.