
5 Perform an Analysis
P
ERFORM A
R
EFERENCE
M
ATERIAL
A
NALYSIS
In 21CFR11 environments, users are required to login to the Confirm application to
start an analysis. Once the analysis window is opened, manual control is disabled
until the analysis has completed. During analysis, pausing and resuming is allowed,
however, steps cannot be skipped.
A reference material analysis is used to verify the analyzer is operating properly and producing
optimum results. These methods provide specifications for critical report quantities and reporting
of whether quantities are in or out of specification.
When running a reference material analysis, use the appropriate reference material provided in
the accessories kit to perform this analysis. The results should match those shown on the label of
the reference material bottle, within the tolerance level.
Ensure the analyzer safety shield is closed before beginning an analysis. If the ana-
lyzer is operated at an excessive pressure, the sample or balance tube could become
dislodged from its port, possibly causing personal injury or damage to the equipment.
1. Go to
File > New Sample > [.SMP]
to create a new sample file.
2. Click
Replace All
. Locate and select the file
Carbon.smp
. Click
Load
. This file contains the
appropriate conditions for analyzing the carbon reference material. All values will be copied
into the new sample file. Edit fields as needed.
3. Click
Save As
, enter a new file name if necessary, click
Save
, then click
Close
.
4. Clean and label a sample tube. If installing a new balance tube, clean and label it also.
5. Determine the sample mass.
6. Degas the sample using a degassing unit.
7. Install the sample tube with degassed sample on the sample port.
8. Install the balance tube (if not installed) on the balance port.
9. Fill the Dewar with liquid nitrogen to about 5 cm (2 in.) from the top. Allow the Dewar to equi-
librate to ambient conditions (approximately 30 minutes).
10. Close the sample compartment door.
11. Go to
Unit [n] > Start Analysis
.
5 - 16
Gemini VII Operator Manual
239-42828-01 (Rev H ) — May 2021
Содержание GEMINI VII
Страница 1: ...OPERATOR MANUAL 239 42828 01 May 2021 Rev H GEMINI VII SURFACE AREA ANALYZER ...
Страница 10: ......
Страница 16: ......
Страница 92: ......
Страница 123: ...REPORT EXAMPLES BJH ADSORPTION REPORT Report Examples Gemini VII Operator Manual 239 42828 01 Rev H May 2021 6 31 ...
Страница 124: ...6 About Reports HORVATH KAWAZOE REPORT 6 32 Gemini VII Operator Manual 239 42828 01 Rev H May 2021 ...
Страница 125: ...ISOTHERM LINEAR PLOT REPORT Isotherm Linear Plot Report Gemini VII Operator Manual 239 42828 01 Rev H May 2021 6 33 ...
Страница 126: ...6 About Reports SAMPLE LOG REPORT 6 34 Gemini VII Operator Manual 239 42828 01 Rev H May 2021 ...
Страница 127: ...T PLOT REPORT t Plot Report Gemini VII Operator Manual 239 42828 01 Rev H May 2021 6 35 ...
Страница 128: ...6 About Reports VALIDATION REPORT 6 36 Gemini VII Operator Manual 239 42828 01 Rev H May 2021 ...
Страница 234: ......
Страница 242: ......
Страница 244: ......
Страница 247: ......
Страница 248: ......