
e. Reconnect the gas line to the regulator.
f. Use two 7/16 in. (11 mm) wrenches to tighten the gas line connection. Hold one wrench
fitting steady and the other to tighten the connector nut.
6. Set the analyzer pressure by doing the following:
a. Turn the
Regulator Control
knob clockwise until the low pressure gauge indicates the
appropriate pressure. See the
Regulator Pressure Settings
table in
.
b. Open the regulator
Shut-off
valve.
c. Open the gas cylinder
Shut-off
valve and flow gas for 10 to 30 seconds.
d. Close the gas cylinder
Shut-off
valve.
e. Close the gas cylinder valve.
7. If the gas line to the instrument inlet was previously disconnected, reconnect it now.
Replace a Gas Cylinder
Gemini VII Operator Manual
239-42828-01 (Rev H ) — May 2021
10 - 13
Содержание GEMINI VII
Страница 1: ...OPERATOR MANUAL 239 42828 01 May 2021 Rev H GEMINI VII SURFACE AREA ANALYZER ...
Страница 10: ......
Страница 16: ......
Страница 92: ......
Страница 123: ...REPORT EXAMPLES BJH ADSORPTION REPORT Report Examples Gemini VII Operator Manual 239 42828 01 Rev H May 2021 6 31 ...
Страница 124: ...6 About Reports HORVATH KAWAZOE REPORT 6 32 Gemini VII Operator Manual 239 42828 01 Rev H May 2021 ...
Страница 125: ...ISOTHERM LINEAR PLOT REPORT Isotherm Linear Plot Report Gemini VII Operator Manual 239 42828 01 Rev H May 2021 6 33 ...
Страница 126: ...6 About Reports SAMPLE LOG REPORT 6 34 Gemini VII Operator Manual 239 42828 01 Rev H May 2021 ...
Страница 127: ...T PLOT REPORT t Plot Report Gemini VII Operator Manual 239 42828 01 Rev H May 2021 6 35 ...
Страница 128: ...6 About Reports VALIDATION REPORT 6 36 Gemini VII Operator Manual 239 42828 01 Rev H May 2021 ...
Страница 234: ......
Страница 242: ......
Страница 244: ......
Страница 247: ......
Страница 248: ......