CFEWH SERIES 1-10
|
INSTALLATIoN
Manual ©2013
|
MicroHeat Technologies Pty ltd
09
08
Installation Procedure
1.
Remove the CFEWH Exterior Cover (10).
2.
Carefully remove the Display PCB/LED plug and
cable (19) (See Page 17) connecting either the
Display PCB or Indicator LED on the outside of
the Exterior Cover to the PCBA (8).
3.
Mount the unit onto the wall. (See page 11)
4.
The electricity supply cable must be brought
through the electric gland, and then mounted.
The cable enters from the rear of the appliance.
5.
Ensure the Circuit Breaker and the Isolation
Switch (if installed) supplying the Live 240VAC
electrical mains to the CFEWH is turned
OFF.
Bring the electrical mains supply cable through
the Electric Mains Supply Cable Gland (15) at
the top right side of the CFEWH Chassis (1).
Connect Live (L)/Neutral (N) and Ground to the
CFEWH PCB via the PCB Terminal Block (14).
6.
Carefully replace the plug and cable (19) (See
Page 17) connecting the Display PCB/LED
indicator to the PCBA (8).
Place the Exterior Cover (10) over the Chassis (1)
and securely affix the two Exterior Cover Screws
(11).
7.
Connect the Water Pressure Limiting Valve
(5.0 bar/72.5 psi/500 kpa) and Shutoff Valve –
not a Stop Tap.
8.
Connect the water supply via the shutoff valve
and pressure limiting valve to the unit.
Connect the cold water in to the Inlet Water
Connection (6) (
BLUE
)
.
NOTE: Flush the cold
water line before connecting to the unit.
9.
Connect the hot water supply to the point of use.
Connect the hot water from the Outlet Water
Connection (7) (
RED
) to the point-of-use.
10.
Run water through the unit without power to
ensure there are no leaks.
Turn the water
OFF
.
11.
Switch
ON the Circuit Breaker and Isolation
Switch supplying the electric mains power to the
unit and check if the unit is turned ON. Check
the indicator LED (16) on the Exterior Cover (10).
If there is no power supplied to the unit, the LED
will not be illuminated.
When power is first applied to the unit, the initial
start up check begins, and the LED will change
colour from
GREEN
to
RED
while the check
sequence is ongoing.
After the initial start up check is complete, and
no errors are detected, the LED on the front of
the Exterior Cover (10) should illuminate
GREEN
and flash slowly.
In the event of a system error or failure, the LED
will either flash or illuminate
RED
. See page 22
in the Reference Section for the List of Error
Descriptions.
If the LED illuminates
RED
constantly, the unit
has entered an irresolvable error condition, and
requires technical intervention.
• Switch off the Isolation Switch to turn
the unit OFF.
• Contact MicroHeat Technical Support
on (03) 9681 7088.
If the LED flashes
RED
, the unit has entered a
resolvable error.
The LED will continue to flash
RED
until the unit
control has resolved the problem.
• Once resolved, the LED will stop
flashing
RED
, and will change to
slow/fast flashing
GREEN
.
IMPORTANT
If the system errors
persist, there is a system failure that
requires technical intervention.
12.
If the LED is slow flashing
gREEN
, the unit is in
standby mode and is ready for use.
13.
Turning hot water on will initiate the heating
process and hot water should exit from of the
point of use water outlet. The LED will illuminate
as fast flashing
gREEN
.
NOTE
It is possible for the water to
be too pure. This is not an error
condition. In this situation, the appliance
will simply perform poorly and will not
operate as specified. The
ORANgE
LED
located on PCBA (8) will be constantly
illuminated. (See page 23 for the location
of the
ORANgE
LED).
Installation
Component guide
This is an at-a-view guide to the 12 steps required to install the unit.
It will allow you to become familiar with the component parts of the unit and will assist you during the
installation process. Full details for wall mounting, electrical and plumbing installation are provided in the
following sections.
Pre-installation
18
10
12
2
1
15
3
8
4
5
17
16
14
7
13
6
11
9
ITEM
PART NUMBER
1
CFEWH Chassis
2
CFEWH Top Cover
3
CFEWH Heat Sink
4
CFEWH Flow Rate Sensor
5
CFEWH Temperature Sensor, Receptacle, Cable and Plug Assembly
6
CFEWH Half Inch Inlet Water Connection
7
CFEWH Half Inch Outlet Water Connection
8
CFEWH PCBA V6.2
9
CFEWH Earth Locking Mechanism
10
SERIES 1-10 – CFEWH Exterior Cover (Premium)
11
Pan Phillips Head Self Tapping Screw x 2 – Exterior Cover Screws
Included in the packaging – provided separately in the small satchel
ITEM
PART NUMBER
12
CFEWH Wall Mounting Screws (Not included in the
packaging)
13
CFEWH Inlet Filter
14
PCB Terminal Block
15
Electric Mains Supply Cable Gland
16
RED/GREEN LED – CFEWH (GREEN Ready/RED Error)
17
Flow Rate/Temperature Setting Display
18
Extension Cover (Optional)
19
Display PCB, Cable and Plug*
20
Display PCB (CFEWH SERIES 1-10 Premium ONLY)*
21
Reset Button*
CFEWH SERIES 1-10
*shown on page 17