20
The Universal Switch Box Harness is designed to connect
to your existing boom control switches. The system will
accommodate from one to four boom switches.
Connect the boom harness to the 4-pin M/P connection
on the main harness. Route the cable to the boom control
switches. If more length is needed, extension cables are
available in 5’, 10’, 15’, 20’ and 25’ lengths.
What you want to accomplish is to attach the boom wires
from the MT-2400 harness to the wires on the shut-off valve
harness that are on the solenoid side of the boom switches.
Attach the RED wire to boom 1, the WHITE wire to boom 2,
the GREEN wire to boom 3 and the BLACK wire to boom 4.
See Illustrations 19A and 19B.
Use the moisture resistant tap connectors supplied with the
kit to make the connections.
NOTE: Always turn power to the switches OFF before
installing or removing tap connectors.
Follow these instructions to install moisture resistant tap
connectors:
1. Turn power OFF.
2. Open the hinged side wall of the 3M Scotchlok
™
Tap
Connector and place unstripped boom valve wire inside
run channel. Close hinged side wall.
3. Insert unstripped tap wire completely into tap port.
4. Using pliers, crimp the U-contact flush with the top of
the insulator.
5. Close cover and latch securely.
PLEASE NOTE: The use of moisture resistant tap connectors
(included) is suggested for this kit. If you are not comfortable
with this type of connection, refer to your vehicle’s service
manual for recommended wire splicing instructions.
Installation
(cont)
Universal Switch Box Harness
Illustration 19A
Illustration 19B
Boom 1 (RED)
Boom 2 (WHT)
Boom 3 (GRN)
Boom 4 (BLK)
BOOM
VA
LVE
WIRE
BOOM
VA
LVE
WIRE
MT
-2405F II BOOM DE
TE
CT
WIRE
BOOM
VA
LVE
WIRE
MT
-2405F II BOOM DE
TE
CT
WIRE
BOOM
VA
LVE
WIRE
MT
-2405F II BOOM DE
TE
CT
WIRE
Power
Booms
Connect
to these
Wires
Содержание MT-2400 LR
Страница 1: ...REFERENCE MANUAL AUTOMATIC RATE CONTROLLER MT 2400 TM LR...
Страница 46: ...Appendices 46...