10.
assemble plastic door (11) over the control panel on the panel bracket, locking it by pushing the
fork on the hinge pin. The opening must came from the bottom upwards.
11.
Assemble the display board (12) under the control panel, using the bolts already fitted on the
four pivot.
2.3.4
CONDENSATE DISCHARGE CONNECTION
Fill with water the siphon delivered with the accessories and fit at the rear bottom of the stainless
steel flue hood.
Make the connection from the condensate discharge outlet with an open connection to the sewer
trunk line, following the local regulations in force.
2.3.5
WATER CONNECTION
The connection of the boiler to the water system should comply with all appropriate regulations.
When the boiler is filled in with water for the first time, make sure that the air is perfectly purged: use
the manual purging drain cock placed on the rear top side of the boiler body, on the purging manifold.
- 15
Содержание 001616006
Страница 2: ......
Страница 10: ...1 6 EXPLODED VIEW OF THE BOILER BLOCK AND CASING 1 6 1 BOILERS DRAWING 10 ...