
www.mhpgrills.com
| 7
OP BASE
CAST ALUMINUM BASE
Attach the Gasket
•
Before bolting the column to the base, the
2-piece gasket must be installed to create
a barrier between the two dissimilar metals.
•
Remove the backing strips from the gasket
to expose the adhesive and stick the gasket
to the bottom lip of the column.
Make sure to align the holes.
Attach the Column to the Base
•
Attaching the column to the base will
be easier to handle by laying the column
face down and matching the holes on
the column lip to the holes on the base.
•
Slide a 1/4 x 20" x 3/4" Hex bolt and
stainless steel round washer down to
the underside of the base through the
pre-drilled hole on the column and
secure using a Kep Nut.
•
Use a 7/16" wrench to hold the Kep Nut
while using a second adjustable wrench
to tighten the bolt. There are a total
of six pre-drilled holes which should
be secured.
HEX BOLT
HEX BOLT
ROUND WASHER
ROUND WASHER
PART NEEDED
3/8" FLARE COUPLING
ADDITIONAL ITEMS NEEDED FOR
PATIO BASE INSTALLATION
(Not Included)
LAG BOLTS (2)
HARDWARE NEEDED
GGM4
KEP NUTS
(QTY. 6)
GGM6
1/4 X 20" X 3/4"
HEX BOLTS (QTY. 6)
GGM11
STAINLESS STEEL
WASHERS (QTY. 12)
TOOLS NEEDED
ADJUSTABLE
WRENCH
7/16" OPEN
END WRENCH
PART NEEDED (FROM OCOL BOX)
GGGSKA/GGGSKB
2-PIECE GASKET (1)
LEFT AND RIGHT
GGCTSS
FLEX TUBE
ATTACH THE BASE TO THE COLUMN (OP BASE)
STEP 3C-OP
Included with
natural gas
bases only
SCAN THE
QR CODE FOR
ASSEMBLY VIDEO