4.0 Delivery and Mobility
All ProCons are supplied fully tested and therefore may contain residual test water.
The test water utilised contains additives that will help prevent the pump from sticking and other
metals from oxidising.
To maintain the structural integrity of the appliance the internal components should not be used
during the lifting and positioning of the unit onto the wall bracket.
All packaging materials should be disposed of in an environmentally way.
4.1 Case Removal
To remove the case insert a flat blade screwdriver or similar into the black latch slots and turn through
90
0
.
Pull the base of the cover forward and up to release the hooks at the top. Ensure that the earth cable
is removed prior to lifting the cover clear.
The lower case housing the display panel can be hinged down to all greater access to all internal
components.
The lower case is secured on either side by thumb nuts located on the return edge on the side case.