Figure
L o c a t i o n o f M a i n t e n a n c e B y p a s s S w i t c h
1-2
Manufacture conduit cable to connect battery cabinet to
UPS.
Procedure for preparing the conduit cable:
•
Cut conduit to length.
•
Cut black and green/yellow wires to length. Wire
lengths should be equal and 1 foot longer that cut
conduit.
•
Mark one black wire on both ends with red tape to
identify this wire as the positive battery lead wire.
(figure 1-3)
•
Leave the other wire unmarked, and this will identify
this wire as the negative battery lead wire.
•
Run black and green wires through conduit. Wires
should extend approximately 6 inches out of
conduit.
•
Fasten conduit fittings at both ends of conduit.
•
Strip wire ends 1/2 inch.
1.3.2
Preparing the
conduit cable
prior to connection
EXL1000
OUTPUT
DISTRIBUTION / XFMR
CABINET
EXL1000
UPS
EXL1000
BATTERY
CABINET
VAC OUTPUT TO
CUSTOMER'S LOAD
VAC IUTPUT
FROM FACILITY
POWER PANEL
CONDUIT
LANDINGS
CONDUIT
LANDINGS
COVERS
BATTERY
BREAKERS
MAINTENANCE
BYPASS SWITCH
BYPASS
NORMAL
1 — 4
86-153226-01
EXL 1000 UPS Extended Battery Cabinet
Содержание EXL 1000
Страница 1: ...EXL 1000 Extended Battery Cabinet Installation Manual...
Страница 14: ...This page left blank intentionally 1 8 86 153226 01 EXL 1000 UPS Distribution Cabinet...
Страница 16: ......
Страница 17: ......
Страница 18: ......