6-4
NORDBERG LT105/105S INSTRUCTION MANUAL
6-38-B
02/02
CHAPTER 6 - TRANSPORT
6.4 TRANSPORT FROM SITE TO SITE
When the LT105 is transported on public road, take
care that it has the necessary permissions from
authorities for special transport. Check the local
regulations, as they vary in each country.
EQUIPMENT NEEDED
–
Low loader, min capacity 40 t (44 st).
MEASURES BEFORE TRANSPORT
1. Turn down additional side walls of the
feeder. (ref 7.4)
2. Turn the side conveyor up. (ref 7.4)
https://tractormanualz.com/
Содержание NORDBERG LT105
Страница 1: ...NORDBERG LT105 LT105S INSTRUCTION MANUAL 140561 B https tractormanualz com ...
Страница 82: ...9 10 NORDBERG LT105 105S INSTRUCTION MANUAL 9 07 B 05 01 CHAPTER 9 MAINTENANCE https tractormanualz com ...
Страница 123: ...https tractormanualz com ...
Страница 124: ...https tractormanualz com ...
Страница 125: ...https tractormanualz com ...
Страница 126: ...https tractormanualz com ...