metrofires Ultra Insert Скачать руководство пользователя страница 3

3

Installation of the Ultra Insert firebox

Ultra Insert firebox installation

1.  Packaged loose within the firebox are 3 fire bricks, air slide lever and 

knob, Top Panel with insulated side Support Panels, top ceramic fibre 
blanket and bolt kit packed with this manual. 

2.  Position the firebox and cabinet into the prepared masonry cavity, 

ensuring cabinet is level and square. The front base of the cabinet 
should extend approximately 50mm forward of the masonry surround 
and have a minimum of 610mm height opening at the front to allow 
space for soft ceramic fibre blanket (not yet fitted). 

3.  Unscrew the ceramic fibre board from the Top Panel (packaged 

in front of the firebox) so the side insulated support panels can be 
riveted in place as illustrated. Leave the cellotape in place that holds 
the ceramic fibre then re-attach the ceramic fibre board again. Slide 
the top panel assembly in over the cabinet sides and under the rear 
blanket while ensuring the panel engages into the slot provided at 
the top of the cabinet. Temporarily screw the top panel in place as 
illustrated.

4.  Place the four speed clips over the large diameter mounting holes 

in the return folds at the front of the cabinet (fascia mount points). 
Attach the fascia ensuring to lift it over the Top Panel as you position 
it prior to pressing it into place. Attach the 4x fascia mounting screws 
(8g x 19mm) while positioning the fascia evenly around the door. With 
the fascia firmly secure, push the fire and fascia fully into position.

5.  If you are satisfied with the position of the cabinet and fascia, while 

confident flue access is acceptable or if any additional telescopic 
offset that may be required to connect the flue has been assessed. 
Then remove the fascia to secure suitable masonry anchors to comply 
with the seismic restraint provisions of AS/NZS2918.

6.  Remove the upper Top Panel from the cabinet and following the flue 

system installation instructions detailed on page 6, proceed and fit 
the flue with All JOINTS SEALED and riveted with a minimum of three 
stainless steel or monel rivets on each joint.

7.  With Pioneer fire cement applied around the perimeter of 150mm 

flue, approximately 20mm below the flue swage, firmly force into the 
flue spigot. Using a 4mm drill bit, drill though the flue via the seismic 
restraint hole in the flue spigot and secure the flue with the 14g Tek 
screw supplied.

8.  Before fitting the Top Panel, first place the Ceramic Blanket overlay 

provided (610 x 340) over both the Top Panel and rear cabinet 
insulation as the Top Panel is positioned, then fix in place with four 8g 
x 10mm screws.

9.  Provisions for wiring the fan unit need to be undertaken by a 

registered electrician with relevant testing to gain electrical compliance 
while leaving the switch in the ‘on position’ once completed.

10.  With electrical connected, fully open the door handle anti-clockwise, 

so the fascia can be refitted while ensuring the fascia is evenly 
positioned around the door frame. Secure the four mounting screws 
and check door operation and required seal to firebox. 

11.  Fitting of the bricks and other components is detailed on page 5.

12.  Check the baffle plate is sitting on it’s four support pins while pushed 

hard against the rear wall of the firebox, with the air tube locked in 
place below the baffle.

13.  Fit the door to the firebox, and refit the fascia as detailed in Diagram 2 

on page 4. The air slide is fitted once the fascia has been installed.

Once the Metro is fully installed it is best to wait 24 hours for the flue seal 
cement to dry. Alternatively, it is recommended you burn a couple of sheets 
of loosely crumpled newspaper at 30 minute intervals over a four-hour 
period before operating fire normally.

Ceramic fibre 

blanket

Diagram 1A - Ultra Insert Firebox

Firebox cabinet

Ceramic fibre 

board

Top panel

Top panel 

side extensions

Air slide

Fascia mount points 

(x4)

Fixing Points For 

Seismic Restraint

Diagram 1 - Firebox cavity

600mm minimum

610mm

Maximum vent 

height / minimum 

open vent area of 

144cm

2

575mm

220mm

560mm

230mm

Содержание Ultra Insert

Страница 1: ...quirements 9 Getting to know your Metro 10 Replacement parts accessories 11 Operating your Metro 11 Cleaning and maintenance 13 Troubleshooting 14 Metro warranty 15 Ultra Insert Wood Fire Wood Fire In...

Страница 2: ...lue pipe exposed A rear cavity vent is required Please see detail in Diagram 1 opposite with full cavity vent requirements and installation detailed on page 8 of this manual In New Zealand the Metro U...

Страница 3: ...lation instructions detailed on page 6 proceed and fit the flue with All JOINTS SEALED and riveted with a minimum of three stainless steel or monel rivets on each joint 7 With Pioneer fire cement appl...

Страница 4: ...or cabinet Ensure the fan rotates freely 4 Rotate the door handle fully anti clockwise before placement of the fascia The inner fascia slips snugly into the cabinet with the Top Rail of the fascia res...

Страница 5: ...s in its correct position in the top chamber of the firebox It should be resting on four support lugs two on each side of the firebox The baffle must be hard back against the rear wall of the firebox...

Страница 6: ...omponents A 1 x Stainless steel weather butterfly B 1 x Stainless steel ECO Cowl top C 1 x 420mm x 240mm diameter stainless steel ECO Cowl housing D 1 x 480mm long stainless steel flue pipe extension...

Страница 7: ...eather butterfly A so the angled sections are facing up With both arms and angled sections of the stainless steel weather butterfly A facing up fit it into the stainless steel ECO Cowl top B and secur...

Страница 8: ...nd bead off around the perimeter Fill the weather seal groove with silicon and embed the weather strip fully into the silicon to ensure weather tightness Chimney vent requirements 230mm Maximum height...

Страница 9: ...de of the door opening making the minimum floor protector width 825mm The insulated floor protector must project from behind the fascia the distance specified I in the table below Minimum projection i...

Страница 10: ...baffle plate promet extension white board on the baffle plate It is critical that the fire not be operated with cracked or broken door glass It is critical that the fire is operated with the fan switc...

Страница 11: ...easoned 12 months later Burning properly seasoned dry fuel will result in Less ash buildup Less emission into the environment Less creosote that can cause a host of issues Maintain a clean flue system...

Страница 12: ...latch After 2 minutes with the kindling well alight fully close the door Intermediate load with air control fully open Approximately 40 minutes after lighting once remaining fuel has formed hot coals...

Страница 13: ...epends on the density and cleanliness of your fuel To remove the excess ash your Metro should not be operating Open the door and using a hearth shovel or similar empty the excess ash directly into a s...

Страница 14: ...We highly recommend the Metro ECO Cowl is fitted as this will increase the draw If you already have an ECO Cowl and smoke is still entering the room please add another 600mm length of flue pipe Downd...

Страница 15: ...the life span will be reduced If your Metro wood fire has been neglected by not being regularly maintained and serviced warranty may be declined It is critical the fire not be operated with over worn...

Страница 16: ......

Отзывы: