![Metrodata NT10G05 Скачать руководство пользователя страница 73](http://html1.mh-extra.com/html/metrodata/nt10g05/nt10g05_user-manual_1779477073.webp)
NT10G05 USER MANUAL
76-02-105 Rev.B
Page 73 of 80
4.2.3.3.1.9.3
EIR Test
If the defined SLA included an EIR definition, then the EIR test is used to prove that
when sending total traffic up to 100% CIR + 100% EIR that the CIR was maintained.
EIR is a best effort service and thus can experience packet loss and still comply with
the SLA, however the CIR is guaranteed so should not see any loss.
The options are:
Perform
If an EIR is defined, run the test
Skip
Do not perform the test
4.2.3.3.1.9.4
Policing Test
The purpose of this test is to ensure that any policers in the network are correctly
configured for CIR/EIR
Traffic is sent at a rate above the CIR + EIR and the CIR is verified
The options are:
Perform
Run the test
Skip
Do not perform the test
4.2.3.3.1.9.5
CBS test
The purpose of this test is to verify that the network has the capability of supporting
bursts as per the SLA. The CBS test will send bursts of frames up to the CBS at the
CIR and verifies there is no packet loss
The options are:
Perform
Run the test
Skip
Do not perform the test