MetriCorr
VL100 & MasterLink Operation Manual
30 | 45
4.4
Battery Hat Solution
Figure 15: Big Fink Battery Hat General layout & appearance
The MetriCorr Big Fink Battery requires only that power cord connected
to connector E (Figure 2), as per
step 3
above. Once power is connected,
ensure that the logger is ON and set up correctly (
see Section 3
).
Secure the hat onto the top of the pole using the terminal board/collar
and twist to lock, as you would a normal Big Fink hat.
Figure 16: Securing the Big Fink Battery Hat
1
Bottom of Modified
Terminal board with
spade terminals
Содержание Slimline MasterLink
Страница 41: ...MetriCorr VL100 MasterLink Operation Manual 41 45 Appendix 1 Junction Box Mounting Guide...
Страница 43: ...MetriCorr VL100 MasterLink Operation Manual 43 45...
Страница 44: ...MetriCorr VL100 MasterLink Operation Manual 44 45...
Страница 45: ...MetriCorr VL100 MasterLink Operation Manual 45 45...