MI 3200 TeraOhm 10 kV
Measurements
31
In this test, the insulation is measured in five equal time periods with test voltages from
one fifth of the final test voltage up to full voltage (see the
Fig. 23
). This function
illustrates the relationship of a materials Insulation resistance and its applied voltage.
Measurement procedure:
-
Connect the test leads to the instrument and to the test object.
-
Press
the
START/STOP
key to start the measurement.
-
Wait until set timer runs out, (the result will be displayed).
-
Wait for the object under test to discharge.
-
The results can be saved by pressing the
MEM
key twice, see the chapter 6.1. Store,
Recall and Clear Operation.
0
0.2U
0.4U
0.6U
0.8U
U
U
T
2T
3T
4T
5T
t
Fig. 23. Step-up test voltage
Legend of displayed symbols:
STEP VOLTAGE
Name of selected function
Fil0 (Fil1, Fil2, Fil3)
Filter type enabled, see the chapter 5.3.
Configuration
5000V
Set test voltage – step 125 V
U=5308V
Actual test voltage – measured value
I=266nA
Actual test current – measured value
19.9G
Insulation Resistance –
result
C=1.2nF
Capacitance of measured object
Tm:05min 00s
Actual test duration
R1000V=20.0G
Last result of 1
st
step
R2000V=20.0G
Last result of 2
nd
step
R3000V=20.0G
Last result of 3
rd
step
R4000V=19.9G
Last result of 4
th
step
R5000V=19.9G
Last result of 5
th
step