Tests and measurements
120
Measurement procedure
Enter the
Z line
function.
Set test parameters / limits.
Connect test cable to the instrument.
Connect test leads or Plug commander to the object under
Start the measurement.
Save results (optional).
Figure 7.44: Examples of Line impedance measurement result
Measurement results / sub-results
Z
Line impedance
Ipsc
Prospective short-circuit current
Uln
Voltage measured between L/L1
– N/L2 test terminals
R
Resistance of line impedance
XL
Reactance of line impedance
Imax3p
Maximal three-phases prospective short-circuit current
Imin3p
Minimal three-phases prospective short-circuit current
Imax2p
Maximal two-phases prospective short-circuit current
Imin2p
Minimal two-phases prospective short-circuit current
Imax
Maximal single-phase prospective short-circuit current
Imin
Minimal single-phase prospective short-circuit current
Prospective short circuit current I
PSC
is calculated as follows:
Z
k
U
I
SC
N
PSC
where:
U
n
......... Nominal U
L-N
or U
L-L
voltage (see table below),
k
sc
........ Correction factor (Isc factor) for I
PSC
information.
U
n
Input voltage range (L-N or L-L)
110 V (93 V
U
L-N
134 V)
230 V (185 V
U
L-N
266 V)
400 V (321 V
U
L-L
485 V)
Table 7.5: Relationship between Input voltage
– U
L-N(L)
and nominal voltage
– U
n
used for
calculation