QC11Y Hydraulic Guillotine Shear
18
The blades need to be ground timely. And It is costly if do not grind the blades
timely. If the blade is not sharp enough, the blade will be hurt due to too much
pressure in cutting and the cutting quality will be affected. So pls make up a
complete blade grinding timeline according to the production status. It is
recommended to have some spare blades for replacement at any time.
Our recommended blade grinding timeline:
(1) For operation 80-100hours, pls turn over the blade sides. The upper blades and
the lower blades can be turned over three times.
(2) For operation 320-400 hours, pls grind the blade. For most severe damaged
blade, pls change the blade. After the blade grinding or when new blade is used, the
blade clearance needs to be reinspected and readjusted.
8.2 Lubrication of the machine
Good lubrication is a must for the proper machine operation and long machine life.
Pls make good lubrication as per our provided procedures.
The main areas for lubrication:
A
、
The guiding rod and thread rod of the back gauge. Lubricate it once a week.
( clean the thread rod off the dirt and oil stains.)
B
、
3 rolled guiding rails. Lubricate it every day for the initial stage of machine
running.
C
、
For the spare parts outside and the rolled bearings, pls lubricate it twice a week.
And pls inspect and clean the lubrication system freaquently and take good care
of them.
8.3
The air pressure inspection of accumulator(the air pressure has been setted
to 5~6 MPa before delivery, need not to adjust unless you have special situation)
When the upper knife beam returns slowly( the oil pressure is proper), pls inspect
the air pressure of accumulator. The inspection way is as below: Make the machine
power on, and do not start the main motor, turn the switch to adjust mode and push
the oil filling button, discharge the return oil pressure and then the upper knife
Содержание HG3208VR
Страница 1: ...19 3 08 HG3208VR HYDRAULIC GUILLOTINE MANUAL S960...
Страница 2: ...QC11Y 8X3200 Hydraulic Guillotine shears Operation Manual Serial No Q709103...
Страница 3: ...QC11Y Hydraulic Guillotine Shear 1 Contents...
Страница 4: ...QC11Y Hydraulic Guillotine Shear 2...
Страница 6: ...QC11Y Hydraulic Guillotine Shear 4...
Страница 8: ...QC11Y Hydraulic Guillotine Shear 6 4 Hoisting and Installation...
Страница 13: ...QC11Y Hydraulic Guillotine Shear 11 overflow valve 5...
Страница 14: ...QC11Y Hydraulic Guillotine Shear 12...
Страница 16: ...QC11Y Hydraulic Guillotine Shear 14 Electric principle print chart 5...