Metacon-Next B.V.
RGS EI(1) 30 - EI(2) 60 - EW 240
12-07-2022
User Manual
art no: 89072 Rev: 1
12
Step 2: Mounting horizontal wall labyrint
Mount the horizontal wall labyrint at the correct height according to Technical
Drawing Metacon-Next. Spread the space between the horizontal wall labyrint and
the guides left and right so that it is equal.
Step 3: Use drilling template
Place the drilling template against and on the guide as shown in the drawing below.
Make sure it is level, mark the hole pattern and remove the drilling jig. Then drill the
holes. (Top inward part of the template is optional)