background image

 

BX-807-9800 REV C 

Page 9 

1.  Remove the BX-807 from the sampling line. 

2.   Pull off the transfer tube. If it is too tight to remove by hand, pry it off with a rigid plastic lever.  

Plastic should be used to avoid damaging the protective finish. 

3.  Remove the top cap and the grit pot by unscrewing them. 

4.   Wet a lint free wipe with water and remove all visible deposits. These are most likely to be 

found at the bottom of the cone inside the grit pot. 

5.  Inspect the O-rings for shape and integrity. If any deformation or cracking is noted, all O-rings 

should be replaced.  When installing new O-rings, lightly lubricate them with O-ring grease. In 
particular, the top cap and main body O-rings should be well lubricated for ease of installing 
the transfer tube. 

6.  Reinstall the SCC and then verify all O-rings are functioning properly.  This should be done 

by performing a system leak check as described in the operation manual of the instrument 
being used with the BX-807. 

4 SPARE 

PARTS 

The following parts are available from Met One Instruments, Inc. for maintenance. 

Consumables

 

Description 

Part Number 

Complete replacement O-ring set for the BX-807

 

720097 

O-ring grease, dielectric silicone, 5 grams

 

995712 

 

Содержание BX-807

Страница 1: ...opyright 2019 Met One Instruments Inc All Rights Reserved worldwide No part of this publication may be reproduced transmitted transcribed stored in a retrieval system or translated into any other lang...

Страница 2: ...Page 2 BX 807 9800 REV C...

Страница 3: ...g 6 2 2 Instrument Assembly and Deployment 6 3 OPERATION AND MAINTENANCE 7 3 1 Recommended Periodic Maintenance Table 7 3 2 Disassembling the BX 807 8 4 SPARE PARTS 9 Table of Figures Figure 1 1 BX 80...

Страница 4: ...vice representatives during normal business hours of 7 00 a m to 4 00 p m Pacific Standard Time Monday through Friday In addition technical information and service bulletins are often posted on our we...

Страница 5: ...as FRM 2 5 equivalent For applications requiring this designation the Met One Instruments Inc BX 808 or BX 809 size selective inlets must be used The BX 807 may be used with any of the following Met O...

Страница 6: ...ntact Met One Instruments Inc see section 1 2 of this manual to arrange for any replacement items needed Please keep all of the special shipping items box foam packing material etc used to ship the SC...

Страница 7: ...3 1 Proper configuration and operation of the instrument with which the SCC is being used will be necessary to maintain the required airflow rate See the operation manual of the associated instrument...

Страница 8: ...wn in Figure 3 2 It demonstrates how the BX 807 comes apart for cleaning Recommended cleaning materials are clean mineral free water and lint free lab wipes In cases where stubborn deposits are observ...

Страница 9: ...deformation or cracking is noted all O rings should be replaced When installing new O rings lightly lubricate them with O ring grease In particular the top cap and main body O rings should be well lu...

Отзывы: