background image

Page 6 

BX-807-9800 REV C 

2 INSTALLATION 

Use the following information to properly deploy the BX-807. Installation of the SCC should ideally 
be performed by personnel familiar with environmental monitoring equipment. There are no special 
precautions or handling concerns except for the normal level of care required for handling scientific 
equipment. Refer to the instructions and diagrams on the following pages.  

2.1 Unpacking 

Unpack the cyclonic separator and inspect it carefully.  Any damage incurred to the equipment 
during shipping is the responsibility of the carrier. If any damage to the shipment is noticed before 
unpacking, 

a claim must be filed with the commercial carrier immediately

. Follow any special 

unpacking instructions provided by the carrier as all items are carefully removed from the containers 
and each component inspected. It is recommended to document and photograph all damaged 
packages and items before, during, and after unpacking them. Contact Met One Instruments, Inc. 
(see section 1.2 of this manual) to arrange for any replacement items needed.  

Please keep all of the special shipping items (box, foam packing material, etc.) used to ship the 
SCC. They should be re-used if the BX-807 is to be transported or shipped (changing site locations, 
returning to the factory, etc.).  Contact Met One Instruments, Inc. (see section 1.2 of this manual) for 
replacement packing materials if necessary. 

2.2  Instrument Assembly and Deployment 

The BX-807 is designed for easy deployment.  It is installed on top of the sample inlet tube as a 
second stage after the BX-802 PM

10

 inlet.  Follow the installation instructions of the instrument with 

which the SCC is being used.  For example, if deploying as part of a BAM 1020 installation, the 
setup instructions in the BAM 1020 operation manual should be followed. 

 

Figure 2-1 Typical BX-807 Installation 

Once the BX-807 is installed, verify all O-rings are functional and a proper seal has been achieved 
by performing a leak check on the system.  The instructions for performing a leak check will also be 
found in the operation manual of the instrument with which the SCC has been deployed. 
 

 

Содержание BX-807

Страница 1: ...opyright 2019 Met One Instruments Inc All Rights Reserved worldwide No part of this publication may be reproduced transmitted transcribed stored in a retrieval system or translated into any other lang...

Страница 2: ...Page 2 BX 807 9800 REV C...

Страница 3: ...g 6 2 2 Instrument Assembly and Deployment 6 3 OPERATION AND MAINTENANCE 7 3 1 Recommended Periodic Maintenance Table 7 3 2 Disassembling the BX 807 8 4 SPARE PARTS 9 Table of Figures Figure 1 1 BX 80...

Страница 4: ...vice representatives during normal business hours of 7 00 a m to 4 00 p m Pacific Standard Time Monday through Friday In addition technical information and service bulletins are often posted on our we...

Страница 5: ...as FRM 2 5 equivalent For applications requiring this designation the Met One Instruments Inc BX 808 or BX 809 size selective inlets must be used The BX 807 may be used with any of the following Met O...

Страница 6: ...ntact Met One Instruments Inc see section 1 2 of this manual to arrange for any replacement items needed Please keep all of the special shipping items box foam packing material etc used to ship the SC...

Страница 7: ...3 1 Proper configuration and operation of the instrument with which the SCC is being used will be necessary to maintain the required airflow rate See the operation manual of the associated instrument...

Страница 8: ...wn in Figure 3 2 It demonstrates how the BX 807 comes apart for cleaning Recommended cleaning materials are clean mineral free water and lint free lab wipes In cases where stubborn deposits are observ...

Страница 9: ...deformation or cracking is noted all O rings should be replaced When installing new O rings lightly lubricate them with O ring grease In particular the top cap and main body O rings should be well lu...

Отзывы: