1.3 Sharp Cut Cyclone 

 

Figure 1-1 BX-807 

The BX-807 Sharp Cut Cyclone (SCC) is a PM

2.5

 size selective inlet for use in ambient particulate 

monitoring. It is a non-US-EPA designated device.  This lack of designation means that any data 
collected using the BX-807 cannot be considered as FRM 2.5 equivalent.  For applications requiring 
this designation, the Met One Instruments, Inc. BX-808 or BX-809 size selective inlets must be 
used. 

The BX-807 may be used with any of the following Met One Instruments, Inc. products: 

 BAM 

1020 

 BAM 

1022 

 E-BAM 

 E-BAM 

Plus 

 E-FRM 

 E-SEQ-FRM 

 

1.4  Model BX-807 Specifications 

PARAMETER 

SPECIFICATION 

U.S. EPA Designations 

None 

Required Flow Rate 

16.7 LPM 

Overall Dimensions 

6.5” high, 6.5” wide, 3” deep. 

Weight 

2.4 Ibs 

Specifications may be subject to change without notice. 

 
 

 

Содержание BX-807

Страница 1: ...opyright 2019 Met One Instruments Inc All Rights Reserved worldwide No part of this publication may be reproduced transmitted transcribed stored in a retrieval system or translated into any other lang...

Страница 2: ...Page 2 BX 807 9800 REV C...

Страница 3: ...g 6 2 2 Instrument Assembly and Deployment 6 3 OPERATION AND MAINTENANCE 7 3 1 Recommended Periodic Maintenance Table 7 3 2 Disassembling the BX 807 8 4 SPARE PARTS 9 Table of Figures Figure 1 1 BX 80...

Страница 4: ...vice representatives during normal business hours of 7 00 a m to 4 00 p m Pacific Standard Time Monday through Friday In addition technical information and service bulletins are often posted on our we...

Страница 5: ...as FRM 2 5 equivalent For applications requiring this designation the Met One Instruments Inc BX 808 or BX 809 size selective inlets must be used The BX 807 may be used with any of the following Met O...

Страница 6: ...ntact Met One Instruments Inc see section 1 2 of this manual to arrange for any replacement items needed Please keep all of the special shipping items box foam packing material etc used to ship the SC...

Страница 7: ...3 1 Proper configuration and operation of the instrument with which the SCC is being used will be necessary to maintain the required airflow rate See the operation manual of the associated instrument...

Страница 8: ...wn in Figure 3 2 It demonstrates how the BX 807 comes apart for cleaning Recommended cleaning materials are clean mineral free water and lint free lab wipes In cases where stubborn deposits are observ...

Страница 9: ...deformation or cracking is noted all O rings should be replaced When installing new O rings lightly lubricate them with O ring grease In particular the top cap and main body O rings should be well lu...

Отзывы: