background image

G915

D

 May 05

10

Attaching the gate bracket to the leaf

The gate bracket connects the secondary arm to the gate leaf.
Position it after following the preceding diagrams. The primary and secondary arms must 
never be less than 5 degrees off a straight line from each other.
Choose a point which is less likely to deflect under load. If necessary, weld support around 
the area where the bracket must be positioned.

Mounting the operators to the gate posts

There  should  not  be  any  visible 
flexing of the mounting points under 
load. To spread the load, all mounting 
holes should be used.
Mount the centre line of the bracket 
130 mm from the inside edge of the 
gate post.
Use  fasteners  of  at  least  10  mm 
diameter x 75 mm length.

Rising hinges

If rising hinges are fitted (to raise the gate as it turns, providing clearance above a sloping 
driveway) then the joints on the opener arms can only allow 70 mm of rise, and 70 mm of 
fall.

Board setup

It is strongly recommended to follow the procedures in the order below:
1.  

Make all Connections

2.  

Set the application mode

3. 

Learn a remote control

4. 

Set motor limit cams

5.  

Run Easy Setup

6.  

Adjust Controls

7.  

Run Professional or Easy Setup again

8.  

Learn wireless remote controls

20

130 for 90º opening
190 for 120º opening

Содержание G915D

Страница 1: ...ease have your serial number and model name available before calling Australia 1800 638 234 New Zealand 0800 653 667 United Kingdom 0800 073 0112 www merlingo com G915D remote control openers security...

Страница 2: ...with a switch that prevents the drive from operating when the wicket is open Connect a Normally Closed switch to the STP and GND terminals of the controller board Locate controls carefully Install an...

Страница 3: ...he power supply from the drive before cleaning or maintaining the gate or drive The drive or gate may operate unexpectedly due to other users with remote controls or due to automatic closing if enable...

Страница 4: ...d Keep the path of the gate free from debris and foliage The gate and its moving parts may sustain damage or wear presenting additional load to the opener Frequently examine the installation for signs...

Страница 5: ...D will blink during learning The controller is ready for another wireless control when the red LED is steadily lit 4 Press P2 RADIO to exit learning mode NOTE The learning procedure will time out afte...

Страница 6: ...the gate The gate hinge pivot points should be perfectly parallel to a plumb line When closed the gate leaves should line up evenly and not bind against each other The leaves should not be damaged or...

Страница 7: ...control wires in the same conduit Low voltage cable sizes Voltage will drop along low voltage cables over long distances It is recommended to use cable with conductors of the following minimum cross...

Страница 8: ...for the weather conditions 6 Keyed switch must be rated suitably for the weather conditions 7 Keypad Merlin M840 wireless optionally with wired power supply 8 Solenoid lock or latch avail for horizont...

Страница 9: ...uld be no more than 200 mm forward of the mounting face of the drive For 120 degrees of opening the mounting bracket should be offset by 160 mm from the hinge Additional side room may be required 420t...

Страница 10: ...To spread the load all mounting holes should be used Mount the centre line of the bracket 130 mm from the inside edge of the gate post Use fasteners of at least 10 mm diameter x 75 mm length Rising hi...

Страница 11: ...otor voltage above 10 V or above 20V for 24V systems battery input A 12V 1 2 Ah sealed back up battery is recommended and should result in suf cient capacity for at least ve full operations in the rst...

Страница 12: ...les a short delay before opening to allow the lock to release before the gate leaf moves The LCU Lamp Control Unit module can accept a lamp rated at up to 12V 15W tx photocell power out TXF photocell...

Страница 13: ...mally Open input can connect to safety devices such as pressure edges or to a switch that enables one wing to open Activating a safety device will prevent movement from fully open or fully closed and...

Страница 14: ...e control Wait 10 seconds to exit learning mode Install the CH RADIO jumper Press and hold P2 RADIO until the red LED is lit Press the second button on the remote control Wait 10 seconds to exit learn...

Страница 15: ...ing The following steps are performed automatically 1 Detects whether one motor or two is tted 2 Sets pedestrian opening on M1 leaf to half way 3 Checks for presence of photocells or a jumper on PHO t...

Страница 16: ...sh for ve seconds and then the board will be ready to operate No memory settings are altered when RESET is pressed No learned wireless transmitters are removed from memory enable testing of safety dev...

Страница 17: ...by the motor power and the time that the power is applied to the obstruction Motor power is determined by the maximum voltage and maximum current This FOR setting alters the motor voltage The Applica...

Страница 18: ...Professional Setup the above behaviours will be modi ed accordingly PAU full anti clockwise Gate opening stop if the beam is interrupted continue opening when the beam is clear once open the gates wi...

Страница 19: ...f between 3 and 30 seconds enable lock strike delay jumper STRIKE If the ELU module is connected along with an electric lock then this jumper may be required When the STRIKE jumper is connected across...

Страница 20: ...process than to press the P1 SET and P2 RADIO buttons on the controller board If so learn one button for P1 learn the button with the CH RADIO jumper removed and one button for P2 learn the button wit...

Страница 21: ...ress P1 SET if Pedestrian Access is required The M1 leaf will begin opening Press P1 SET at the time where the Pedestrian Access wing is at the desired open position The leaf will close fully and the...

Страница 22: ...iced if it is heavy to move by hand Transmitter range is less than normal Your transmitter battery may be going at If you have an external antenna then the wire may be damaged SOLUTION Replace the tra...

Страница 23: ...23...

Страница 24: ...building to which the Unit is attached G Faulty or at batteries in the remote control transmitter H Where the defect is due to conditions other than normal domestic use or dirt misuse neglect re acci...

Страница 25: ...rd fuse 2 A 5 x 20 Replacement motor fuse 10 A 5 x 20 Remote control battery Depends on model either 4LR44 6V or CR2025 3V Gate stops optional but recommended Gate solenoid lock optional but recommend...

Страница 26: ...es or phone Merlin toll free New Zealand Auckland phone 09 415 4393 Phone toll free 0800 653 667 or 0800 MERLIN Fax toll free 0800 653 663 Australia NSW Vic Qld WA Phone toll free 1 800 638 234 Fax to...

Страница 27: ...5 sec 0 1 sec delay 2 5 sec delay DEL leaf closing delay 3 to 60 sec 3 sec close delay 30 sec close delay STRIKE delay open 1 sec TEST delay all 0 2 sec RESET 1 flash G815D 2 flashes G950 G915D red P2...

Страница 28: ...OFF cw OFF Force speed voltage 50 100 cw max STRIKE jumper ON OFF TEST jumper ON OFF Gates New or existing Leaf width x height Construction type coverage Load measured at gate bracket without opener c...

Отзывы: