![MerCruiser Vazer 100 Скачать руководство пользователя страница 45](http://html.mh-extra.com/html/mercruiser/vazer-100/vazer-100_owners-manual_1772961045.webp)
Section 3 - On The Water
90-899883182 NOVEMBER 2007
Page 37
OPERATION CHART
Operation Chart
BEFORE STARTING
AFTER STARTING
WHILE
UNDERWAY
STOPPING and SHUT
DOWN
Install the bilge drain plug.
Observe all gauges to
check the condition of
the engine. If it is not
normal, stop the
engine.
Frequently observe
all gauges to check
the condition of the
engine. If it is not
normal, stop the
engine.
Shift the remote control
lever to the neutral
position.
Open the engine hatch. Air out the
bilge completely.
Check for fuel, oil,
water, fluid, and
exhaust leaks.
Listen for the audio
alarm.
Turn the ignition key to the
"OFF" position.
Turn the battery switch on, if
equipped.
Check the shift and
throttle control
operation.
Turn the battery switch to
the "OFF" position, if
equipped.
Turn on and run the engine
compartment bilge blower, if
equipped, for 5 minutes.
Check the steering
operation.
Close the fuel shut‑off
valve, if equipped.
Open fuel shut off valve, if
equipped.
Flush the seawater
cooling circuit, if operating
in saltwater, brackish
water, or polluted water.
Place sterndrive in full down (in)
position.
Drain the bilge.
Check the engine oil.
Perform all other checks specified
by your dealer and boat builder.
Listen for the Audio Warning Alarm
to sound when the ignition switch is
in the "ON" position.
Warm‑up the engine at a fast
idle‑RPM for several minutes.
Starting and Stopping the Engine
NOTE: Only perform those functions applicable to your power package.
STARTING THE ENGINE
1. Check all items listed in the Operation Chart.
2. Place the remote control handle in neutral.
NOTICE
Without sufficient cooling water, the engine, the water pump, and other components will
overheat and suffer damage. Provide a sufficient supply of water to the water inlets during
operation.
!
WARNING
Explosive fumes contained in the engine compartment can cause serious injury or death
from fire or explosion. Before starting the engine, operate the bilge blower or vent the
engine compartment for at least five minutes.
Содержание Vazer 100
Страница 8: ...Page iv 90 899883182 NOVEMBER 2007 ...
Страница 26: ...Section 1 Warranty Notes Page 18 90 899883182 NOVEMBER 2007 ...
Страница 40: ...Section 2 Getting to Know Your Power Package Notes Page 32 90 899883182 NOVEMBER 2007 ...
Страница 54: ...Section 3 On The Water Notes Page 46 90 899883182 NOVEMBER 2007 ...
Страница 60: ...Section 4 Specifications Notes Page 52 90 899883182 NOVEMBER 2007 ...
Страница 67: ...Section 5 Maintenance 90 899883182 NOVEMBER 2007 Page 59 Date Maintenance Performed Engine Hours ...
Страница 114: ...Section 7 Troubleshooting Notes Page 106 90 899883182 NOVEMBER 2007 ...