background image

P 9

Please retain product label and instructions for future reference

             

Step 16

Parts needed - No. 26 QTY 4

Place the 4x Truss Bs 

(No. 26) 

onto the building. Fix the Truss 

Bs to the Truss As screwing 

down with 1x40mm screw.

The fix the Truss B’s to the top 

roof purlin with 1x40mm screw 

as shown. 

8x40mm Screws 

Step 17

Parts needed - No. 27 QTY 4

Fix Truss C 

(No. 27)

 to Truss A 

screwing down at an angle with 

1x40mm screws per board as 

shown. 

Then fix to the roof purlins with 

2x40mm screws per board.

12x40mm Screws 

26

26

26

26

Pre drill 

hole

40mm 

screw

Pre drill 

hole

40mm 

screw

27

27

27

27

27

Содержание 0644LOG178-V4

Страница 1: ...nsit and for upto 3 months against mould To validate your guarantee and ensure longevity of the product it is ESSENTIAL the building is treated with a wood preserver within the first three months of a...

Страница 2: ...Y 19 LB44 A 4200 Purlin 45x120x5808mm QTY 5 F45120 A 5808 Fascia 16x120x2237mm QTY 4 S16120 G 2237 Angled Fascia 16x120x2900mm QTY 4 S16120 2900 Eaves frame 27x44x2900mm QTY 4 F2744 2900 Roof Board 16...

Страница 3: ...erence Finisher Board 44x45x1978 QTY 4 LB44RG45 B 1978 Finisher Board 44x45x1771 QTY 2 LB44RG45 C 1771 32 31 33 90mm Bolt Set x16 34 35 Felt 36 Pre assembly Please note Each board interlocks at either...

Страница 4: ...1 QTY 4 Place the small angled bearers No 21 into each corner as shown in the illustration Ensure there is an equal amount of space between each frame Secure each of the frames in place using 2x70mm s...

Страница 5: ...r illustrative purposes and may differ from your choice in product regarding door position Nevertheless the process of fitting the door frame is the same Please Note The short boards at the front of t...

Страница 6: ...frames Ensure that the boards are level and flush with each other as you lay each one 4x70mm 10 10 8 7 9 11 Step 8 Following the same method place the assembled garage door frame inbetween the short...

Страница 7: ...le into position by screwing through the notches as shown in the illustration Ensure that the boards are level and flush with each other as you lay each one 4x70mm Screws Pre drill hole 70mm screw 4 4...

Страница 8: ...ure the purlins at each end by screwing through the bars into the boards ensure to pre drill to avoid the boards splitting using 6x70mm screws per purlin Please note The gable shown is for illustrativ...

Страница 9: ...g down with 1x40mm screw The fix the Truss B s to the top roof purlin with 1x40mm screw as shown 8x40mm Screws Step 17 Parts needed No 27 QTY 4 Fix Truss C No 27 to Truss A screwing down at an angle w...

Страница 10: ...move the excess Place the cut down board s back onto the roof and secure into place using 4x40mm screws per board Please Note This image is for illustrative purposes and may differ from your choice in...

Страница 11: ...0x Felt Tacks Step 20 Parts needed No 24 QTY 8 Inside the building place a closure trim No 24 against the boarding and align with the roof as shown in the illustration Once in position fix each trim i...

Страница 12: ...33 3 Step 23 Parts needed No 3 QTY 1 No 33 QTY 6 Using the screws and bolts provided attach the band part of the hinge s No 33 to the front of the garage doors No 3 Ensure to align the band with the...

Страница 13: ...ded No 35 QTY 2 Using the screws provided attach the pull handles without the locking bar No 35 to the front of the garage doors Step 27 Parts needed No 22 QTY 1 No 34 QTY 1 Fix the garage door strip...

Страница 14: ...uilding internally Place 2x storm braces per side fixing into place using 2x 90mm bolts per brace making sure the washer nut are tightened from the outside of the building Ensure the storm braces are...

Отзывы: