P 9
Please retain product label and instructions for future reference
Step 16
Parts needed - No. 26 QTY 4
Place the 4x Truss Bs
(No. 26)
onto the building. Fix the Truss
Bs to the Truss As screwing
down with 1x40mm screw.
The fix the Truss B’s to the top
roof purlin with 1x40mm screw
as shown.
8x40mm Screws
Step 17
Parts needed - No. 27 QTY 4
Fix Truss C
(No. 27)
to Truss A
screwing down at an angle with
1x40mm screws per board as
shown.
Then fix to the roof purlins with
2x40mm screws per board.
12x40mm Screws
26
26
26
26
Pre drill
hole
40mm
screw
Pre drill
hole
40mm
screw
27
27
27
27
27