It is ESSENTIAL that you apply wood
treatment immediately after the building
has been assembled.
P 14
Please retain product label and instructions for future reference
23
23
Step 28
Parts needed - No. 23 QTY 10
Arrange the storm braces (
No. 23
)
around the building (
internally
).
Place 2x storm braces per side
fixing into place using 2x 90mm
bolts per brace making sure the
washer & nut are tightened from
the outside of the building.
*Ensure the storm braces are
secured at the highest point
possible on each side.
**Storm braces will help your
building expand and contract
properly.
***Important: Ensure each
bolt is tightened using a
washer so as not to damage
the log boards.
16x90mm Bolt Sets
Pre drill
hole
90mm
bolt