background image

P 7

Please retain product label and instructions for future reference

15

23b

18

18

IMPORTANT : 

Pre-drill before fixing screws.

15

15

15

Pre drill 

hole

Step 11

Parts needed - No. 15 QTY 3

 

Align the Roof Purlin(

s

) (No. 

17) into the cut out slots on each 

gable top ensuring each purlin 

interlocks the boards.

 

Secure the purlins at each 

end by screwing through the bars 

into the boards (ensure to pre-drill 

to avoid the boards splitting) using 

4x70mm screws per purlin.

*Please note:

 The gable shown is for 

illustrative purposes and may differ 

in width from your choice in prod-

uct. 

Nevertheless, despite any differenc-

es 

the process of fixing the purlins 

is the same.

70mm 

screw

a

b

a

b

18

Step 12

Parts needed - No. 18 QTY 80

 

Place the first two roof 

board’s (No. 18) onto the assembly 

on each side, making sure the 

boards are flush to the end of the 

roof purlin. Once in position fix to 

each purlin using 3x40mm screws.

Due to natural occurences of

 wood shrinkage / expansion. 

You maybe required to use

 the provided spacers and 

place a space of 2mm to 

ensure every roof board 

lines up with the truss’.

*Ensure the roof boards meet

at the top of the apex and leave

an overhang at the bottom.

Continue adding the roof boards

along the roof, fixing each one into

position using 3x40mm screws,

making sure that each board is 

interlocked, flush at the bottom &

meet at the top of the apex.

 

The last board on each side 

will overhang: Using a staight edge

and a pencil mark out a line as 

a guide. 

Cut along the pencil mark and

remove the excess. Place the

cut down board’s back onto the

roof and secure into place

using 3x40mm screws per

board.

*Please Note: 

This image is for 

illustrative purposes and may differ 

from your choice in product. 

Nevertheless the process of cutting 

and fitting the last roof boards is the 

same.

234x40mm Screws 

40mm 

screw

Pre drill 

hole

*

Cut to fit

a

b

a

b

IMPORTANT : 

Pre-drill before fixing screws.

Содержание 0628LOG114-V4

Страница 1: ...sprayed with water during extended periods of warm sunshine and sheltered as much as possible during rain or snow BUILDING A BASE When thinking about where the building and base are going to be constr...

Страница 2: ...x120x4000mm QTY 19 LB28 A 4000 Log Board 28x120x3396mm QTY 2 LB28 AE 3396 11 Log Board WA 28x120x3896mm QTY 2 LB28 AE 3896 12 Log Board WA 28x120x4396mm QTY 2 LB28 AE 4396 13 Bearer 44x44x2804mm QTY 2...

Страница 3: ...ered pattern Before securing ensure that the boards are fitted properly in their respective tongues and grooves P 3 Please retain product label and instructions for future reference Felt Tacks x600 70...

Страница 4: ...method arrange the remaining framing No 14 as shown in the illustration Ensure there is an equal amount of space between each frame Secure each of the frames in place using 2x70mm screws for each side...

Страница 5: ...No 9 QTY 6 Lay the next 6 boards No s 5 6 8 9 onto the assembly to create your second level Ensure that the boards are level and flush with each other as you lay each one Doors can be hung once the b...

Страница 6: ...st two boards No s 9 22 onto the front of the assembly Once in position place log board No 12 onto the plain sides fixing into position by screwing through the notches as shown in the illustration Ens...

Страница 7: ...Once in position fix to each purlin using 3x40mm screws Due to natural occurences of wood shrinkage expansion You maybe required to use the provided spacers and place a space of 2mm to ensure every ro...

Страница 8: ...l Continue adding the floor boards internally making sure to interlock each individual board Do NOT secure the boards until the last board has been measured and cut Measure the gap between the bottom...

Страница 9: ...al space 21 21 Pre drill hole 30mm screw trim to fit Step 15 Parts needed No 21 QTY 6 Inside the building place the closure trim No 21 against the boarding and align with the roof as shown in the illu...

Страница 10: ...ole 40mm screw Step 19 Parts needed No 20 QTY 8 Arrange the storm braces No 20 around the building internally Place 2x storm braces per side fixing into place using 2x 70mm bolts per brace making sure...

Отзывы: