P 6
Please retain product label and instructions for future reference
Step 8
Part needed - No. 5 QTY 12
No. 6 QTY 6
No. 8 QTY 8
No. 9 QTY 6
No. 10 QTY 2
No. 11 QTY 2
Following the same method
outlined in
Pre-Assembly
, lay
the remaining boards (No’s. 5,
6, 8, 9, 10 & 11) onto the
assemblyto bring the board
level to the top of the window
and door frames.
*Ensure that the boards are
level and flush with each
other as you lay each one.
Step 9
Parts needed - No. 9 QTY 1
No. 12 QTY 2
No. 22 QTY 1
Lay the last two boards
(No’s. 9 & 22)
onto the front
of the assembly.
Once in position place log
board
(No. 12)
onto the
plain sides, fixing into
position by screwing
through the notches as
shown in the illustration.
*Ensure that the boards are
level and flush with each
other as you lay each one.
4x70mm Screws
70mm
screw
Step 10
Parts needed - No. 3 QTY 2
Place the gable tops
(No. 3)
onto the assembly. Fix into
position by screwing
through the notches as
shown in the illustration.
*Ensure that the boards are
level and flush with each
other as you lay each one.
4x70mm Screws
70mm
screw
6
9
5
5
8
8
10
11
10
11
12
9
22
12
3
3
IMPORTANT :
Pre-drill before fixing screws.
IMPORTANT :
Pre-drill before fixing screws.