Please retain product label and instructions for future reference

Step 4 

Parts needed - No. 5 QTY 6

 

 

 No. 7 QTY 6

 

 

 No. 8 QTY 12

 

 

 No. 9 QTY 6

Lay the first 6 boards (No’s. 5, 7, 

8 & 9) onto the starter 

boards to create your first 

level.

*Ensure that the boards are

level and flush with each

other as you lay each one.

Please Note: 

The short boards at the

front of the building (either side of

the door and window opening’s)

can be placed either side depending

on your needs.

Step 5 

Parts needed - No. 5 QTY 12

 

 

   No. 6 QTY 6 

 

 

   No. 8 QTY 12

 

 

   No. 9 QTY 6

Lay the next 6 boards 

(No’s. 5, 6, 

8 & 9)

 onto the assembly

 to create your second 

level.

*Ensure that the boards are

level and flush with each

other as you lay each one.

Doors can be hung once 

the boarding has enclosed 

the door frame by 12-13

 boards, refer to door installation 

instructions, if not, you can

 install the door at step 7.

***Please Note: 

The short boards placed

to create the opening’s for the doors &

windows can be placed either side 

depending on your needs. 

8

8

9

7

5

8

8

5

5

6

9

Step 6 

(See Window-Assembly)

Parts needed - No. 1 QTY 1

 

 

   

Refer to window assembly 

instructions to assemble 

windows.

Step 6 

Parts needed - No. 1 QTY 1

 

 

   

Ensure that the lip of the 

window frame is located on 

the inside of the building .

Содержание 0628LOG114-V4

Страница 1: ...sprayed with water during extended periods of warm sunshine and sheltered as much as possible during rain or snow BUILDING A BASE When thinking about where the building and base are going to be constr...

Страница 2: ...x120x4000mm QTY 19 LB28 A 4000 Log Board 28x120x3396mm QTY 2 LB28 AE 3396 11 Log Board WA 28x120x3896mm QTY 2 LB28 AE 3896 12 Log Board WA 28x120x4396mm QTY 2 LB28 AE 4396 13 Bearer 44x44x2804mm QTY 2...

Страница 3: ...ered pattern Before securing ensure that the boards are fitted properly in their respective tongues and grooves P 3 Please retain product label and instructions for future reference Felt Tacks x600 70...

Страница 4: ...method arrange the remaining framing No 14 as shown in the illustration Ensure there is an equal amount of space between each frame Secure each of the frames in place using 2x70mm screws for each side...

Страница 5: ...No 9 QTY 6 Lay the next 6 boards No s 5 6 8 9 onto the assembly to create your second level Ensure that the boards are level and flush with each other as you lay each one Doors can be hung once the b...

Страница 6: ...st two boards No s 9 22 onto the front of the assembly Once in position place log board No 12 onto the plain sides fixing into position by screwing through the notches as shown in the illustration Ens...

Страница 7: ...Once in position fix to each purlin using 3x40mm screws Due to natural occurences of wood shrinkage expansion You maybe required to use the provided spacers and place a space of 2mm to ensure every ro...

Страница 8: ...l Continue adding the floor boards internally making sure to interlock each individual board Do NOT secure the boards until the last board has been measured and cut Measure the gap between the bottom...

Страница 9: ...al space 21 21 Pre drill hole 30mm screw trim to fit Step 15 Parts needed No 21 QTY 6 Inside the building place the closure trim No 21 against the boarding and align with the roof as shown in the illu...

Страница 10: ...ole 40mm screw Step 19 Parts needed No 20 QTY 8 Arrange the storm braces No 20 around the building internally Place 2x storm braces per side fixing into place using 2x 70mm bolts per brace making sure...

Отзывы: