Pre drill
hole
70mm
screw
Pre drill
hole
70mm
screw
Pre drill
hole
IMPORTANT :
Pre-drill before fixing screws.
Example picture
2 screws per bearer per end.
P 4
Please retain product label and instructions for future reference
13
Step 1
Parts needed - No. 13 QTY 2
No. 14 QTY 2
Lay the starters
(No. 13 & No. 14)
onto a firm and level surface
(free from areas where standing
water can collect)
as shown in the
illustration.
Fix the framing together at each
corner using 8x70mm screws,
ensuring the frame is flush.
8x70mm Screws
Step 2
Parts needed - No. 14 QTY 7
Following the same method,
arrange the remaining framing
(No. 14)
as shown in the
illustration.
*Ensure there is an equal
amount of space between each
frame.
Secure each of the frames in
place using 2x70mm screws
for each side of the bearer,
ensuring the framing remains
level.
28x70mm Screws
70mm
screw
Step 3
Parts needed - No. 4 QTY 2
No. 8 QTY 2
Place the starter boards (No’s.
4 & 8) on to assembled base
frame along the longest sides.
*Ensure the notches at either
end of each board are flush
and level with the ends of the
frame.
Fix each of the starter boards to
the frame by screwing through
the notch into the frame as
shown in the illustration.
4x70mm Screws
14
13
14
13
14
14
14
14
14
14
14
14
14
8
4
8
4
IMPORTANT:
Pre-drill before fixing screws.
IMPORTANT :
Pre-drill before fixing screws.
4