For assistance please contact customer care on: 01636 821215
Mercia Garden Products Limited,
Sutton On Trent,
Newark,
Nottinghamshire,
NG23 6QN
www.merciagardenproducts.co.uk
Step 5
Parts needed - No. 11 QTY 2
Secure the Small Floor Panels
(No.
11)
to the floors assembled in the
previous step using 8x50mm
screws through the floor bearers in
an alternating pattern.
Once fixed together turn the floor
back the right way up.
Place the assembled floor panels
(No. 1 & 11)
onto a firm and level
base. Ensure the base has suitable
drainage, free from areas where
standing water can collect.
16x50mm Screws
Pre drill
hole
50mm
screw
11
11
11
11
1
1
1
1
Step 6
Parts needed - No. 3 QTY 2
No. 5 QTY 2
Fix the Side Window Panel
(No. 3)
and the Plain Panel
(No. 5)
togeth-
er by screwing through the fram-
ing using 5x50mm screws.
Ensure to stagger screws to avoid
colliding.
Repeat this with the second Side
Window Panel and the Plain Panel
but the opposite way round, as
shown in the diagram.
10x50mm Screws
Pre drill
hole
50mm
screw
**Please note that when you
fix the Plain Panel (No. 5) to the
second Side Window Panel (No. 3),
this is to be fitted to the opposite
side.
3
5
3
5
P 5
Please retain product label and instructions for future reference
Содержание 03DTMBHP1206RFP
Страница 18: ...2 1 3 4...
Страница 19: ...REGISTER FOR YOUR ANTI ROT GUARANTEE TODAY PLEASE SCAN HERE 1 2...