P 4
Please retain product label and instructions for future reference
Step 3
Parts needed - No. 4 QTY 2
No. 12 QTY 1
No. 13 QTY 1
No. 36 QTY 6
Fix the Secondary Door
(No. 13)
to
the Front Window Panel
(No. 4).
Secure the T-hinges
(No. 35)
to the
Front Window Panel
(No. 4)
with
3x30mm screws per hinge.
Then fix the T-hinges
(No. 36)
to
the door with 3x30mm screws per
hinge.
Repeat the process for the Master
Door
(No. 12)
36 x 30mm Screws
36
36
Pre drill
hole
30mm
screw
13
12
Secondary Door
Master Door
4
4
1
1
Step 4
Parts needed - No. 1 QTY 2
Secure the floors
(No. 1)
together
using 8x50mm screws through the
floor bearers in an alternating
pattern.
8x50mm Screws
Pre drill
hole
50mm
screw
1
1
Содержание 03DTMBHP1206RFP
Страница 18: ...2 1 3 4...
Страница 19: ...REGISTER FOR YOUR ANTI ROT GUARANTEE TODAY PLEASE SCAN HERE 1 2...