P 12
Step 24
Parts needed - No. 25 QTY 1
Attach the Flat Roof Strip
(No. 25)
to the top of the Summer House by
screwing into each block below..
5x30mm Screws
Pre drill
hole
30mm
screw
25
Step 25
Parts needed - No. 22 QTY 6
Fix each of the six Eaves
frames
(No. 22)
to the walls
touching the Roof with 4x
40mm screws in each piece of
framing.
**Make sure that the screws
go into the framing behind.
24x40mm Screws
Pre drill
hole
40mm
screw
22
22
22
22
22
22
Step 26
Fix the roofs to the panels
below by screwing down
through the roofs into the
panel framing below using
40mm screws.
28x40mm Screws
Pre drill
hole
40mm
screw
Step 27
Fix the building to the floor by internally
screwing down through the framing of
the panels into the floor framing using
33x50mm screws.
33x50mm Screws
Pre drill
hole
50mm
screw
B
B
B
B
B
B
B
B
B
B
B
B
B
B
B
B
B
Please retain product label and instructions for future reference
Содержание 03DTMBHP1206RFP
Страница 18: ...2 1 3 4...
Страница 19: ...REGISTER FOR YOUR ANTI ROT GUARANTEE TODAY PLEASE SCAN HERE 1 2...