P 10
Please retain product label and instructions for future reference
Step 19
Parts needed - No. 7 QTY 1
No. 14 QTY 1
Place one of the 6Ft Roof Panels
(No. 7)
on the floor. Place the main
Roof Bearer A
(No. 14)
flat on the
bevelled end with the pointed
corner meeting the line drawn in
Step 16.
Fix Roof Bearer A
(No. 14)
to the 6Ft
Roof Panels
(No. 7)
by using a
60mm screw in the pre drilled hole
that was made in Step 15.
1x60mm Screws
Pre drill
hole
60mm
screw
Position Roof Bearer A
up against the drawn line
and fix to 6Ft Roof.
7
7
14
14
SIDE VIEW
VIEW FROM ABOVE
B
Step 20
Parts needed - No. 7 QTY 2
No. 8 QTY 1
No. 9 QTY 1
No. 10 QTY 1
No. 14 QTY 2
No. 16 QTY 5
*The use of a step ladder is
essential to construct the
roof.*
To construct the Roof,
place the previously assembled
(in Step 19) 6ft Roof Panel
(No.
7)
and Roof Bearer A
(No. 14)
on top of the Summer House
and let the pointed edge on the
other end of the bearer meet
the line drawn (in Step 16) on
the second 6ft Roof Panel
(No.
7)
.
When in position, Use
1x60mm screw to fix up
through the previous drilled
hole (in Step 15) of the bearer
into the roof frames. The beve-
led end of the bearer must be
flat against the roof.
Once secure, place the
third set of roof panels previ-
ously assembled (in Step 13)
onto the building as shown.
You will secure it in the next
couple of steps.
1x60mm Screws
Pre drill
hole
60mm
screw
A
B
A
B
C
C
16
14
8
10
9
7
7
Содержание 03DTMBHP1206RFP
Страница 18: ...2 1 3 4...
Страница 19: ...REGISTER FOR YOUR ANTI ROT GUARANTEE TODAY PLEASE SCAN HERE 1 2...