Please retain product label and instructions for future reference
Step 12a
Once the roof is fixed in place,
secure the building to the floor
using 18x50mm screws.
*Ensure to screw through the
framing into the floor bearers.
18x50mm Screws
Pre drill
hole
50mm
screw
Step 13a
Parts needed - No. 10 QTY 4
Attach the cover trims
(No. 10)
to each corner of the building
using 3x30mm screws per
cover trim.
12x30mm Screws.
10
10
10
Pre drill
hole
30mm
screw
Step 15a
Parts needed - No. 27 QTY 2
Align the Veranda Side Rails
(No. 27)
against the door gable and flush to
ends of the veranda floor, secure to
the building and to veranda floor
with 6x50mm screws per side as
shown in the illustration.
12x50mm Screws
Pre drill
hole
50mm
screw
27
27
27
Step 14a
Parts needed - No. 26 QTY 1
Place the Veranda Floor
(No. 26)
on
the ground flush to the door gable
as shown in the illustration.
*Ensure the veranda floor sits
centrally to the building.
26
P 9
Содержание 03BRN0705-V5
Страница 13: ...2 1 3 4...
Страница 14: ...REGISTER FOR YOUR ANTI ROT GUARANTEE TODAY PLEASE SCAN HERE 1 2...