manualshive.com logo in svg
background image

• All Weather Durable PVC
• Won’t Dent, Rust, Rot or Mildew
• Tall Walk In Shed
• Never Needs Painting
• 61 Inch Wide Double Doors
• Easy Assembly
• High Wind Tested
• Snow Load Tested 20lbs/sq. foot
• Pad Lock Ready (Lock not included)
• Wooden or Cement Foundation Needed

Call us for any missing or damaged parts.

Do not return to the store.

Requires two people and takes about
3-4 hours for Installation.

Your Total Solution To Maintenance Free Storage Sheds.

Available Kits

• Foundation Kit Available
• Modular 2.5 Ft Extension Kits Available
• 8 Ft x 6 Ft Window Kits Available

Ver: 0.0

OWNER’S MANUAL / 

Instructions for Assembly ‘

8 Ft WoodSide’

Size 8 Ft x 6 Ft  / 2.4 m x 1.6 m

 

(Approx.)

Vinyl Garden Shed

Vinyl Garden Shed

A Product of

TM

A L L   P U R P O S E   V I N Y L   G A R D E N   S H E D S

Building Dimensions  :

Approximate 

Size

Storage

Exterior Dimension

Interior Dimension

8 Ft x 6 Ft

39 Sq. Ft

238 1/4 Cu. Ft

Roof Edge to Edge

Base Dimension

Door Opening

2.4 m x 1.6 m

3.6 Sq. m

6.8 Cu. m

Width
Depth

Height

inch

 cm

94 1/4

239.4

inch

 cm

63 1/8

160.3

94 3/8

239.7

64

162.5
196.2

inch

 cm

92 1/4

234.3

inch

 cm

61 1/8

155.2

60 5/8

154

Wall to Wall

Area

Volume

Customer

Service Hotline
(800) 483-4674

www.uspolymersinc.com

71 1/2

181.6

73

185.5

77 1/4

Содержание 8 Ft WoodSide

Страница 1: ...ts Available 8 Ft x 6 Ft Window Kits Available Ver 0 0 OWNER S MANUAL Instructions for Assembly 8 Ft WoodSide Size 8 Ft x 6 Ft 2 4 m x 1 6 m Approx Vinyl Garden Shed Vinyl Garden Shed A Product of TM A L L P U R P O S E V I N Y L G A R D E N S H E D S Building Dimensions Approximate Size Storage Exterior Dimension Interior Dimension 8 Ft x 6 Ft 39 Sq Ft 238 1 4 Cu Ft Roof Edge to Edge Base Dimensi...

Страница 2: ...re and other causes which is beyond our control Claims under this warranty must be made within the warranty period by calling 1 800 483 4674 or mail in a dated sales slip and clear photograph of the part to U S Polymers Inc 1057 S Vail Ave Montebello CA 90640 We reserve the right to discontinue or change components If a component has been discontinued or is not available U S Polymers Inc reserves ...

Страница 3: ...w the steps given in the manual carefully for correct assembly 7 Make sure all parts are present before you start assembling 8 BE SAFE Follow safety instructions and avoid injury See inside page 9 GROUND MUST BE EVEN Make sure the foundation frame lies flat on the ground If the earth bed is uneven remove sod and other debris and level it with a flat shoval 10 Separate contents of the carton by the...

Страница 4: ...ssembly of the shed Familiarize yourself with the operation of all the power tools 3 Children and pets should be kept away from the assembly site to avoid any distractions and accidents 4 When using a step ladder make sure it is on even ground and fully open with the safety latch in place Never concentrate your full weight on the roof or any part of the shed 5 Do not attempt to assemble the shed o...

Страница 5: ... poured to a thickness of 4 inches 100mm to 5 inches 125mm Allow to dry thoroughly for at least 48 hours Your shed must be firmly anchored to the concrete pad or large concrete patio stone squares to help protect against damage in high winds Care Maintenance Although this unit does not require any maintenance care should be taken to prolong the life of your shed ROOF Keep roof clean of leaves and ...

Страница 6: ...2B B1LB B1RB CB1B CB2B CB3B CB3XB CB4F MJ RS1XB1 RS3LH RS8B1 RS9B1 RS5B1 RS2B1 RS10A1 RS4XB1 RS11A1 RS12B1 DSH1 RS14B CDLA CDRA CCA CMA FDCL FDCR FCB FMC FCC RJ EPS CBC PIN PPG PWS S1 S2 S7 CODE QTY B1LB 1 B1RB 1 B2B 2 B21 1 B22 1 CB1B 2 CB2B 2 CB3B 1 CB3XB 1 CB4F 2 RS1XB1 4 RS2B1 4 RS3LH 2 RS4XB1 2 RS5B1 4 RS8B1 4 RS9B1 4 RS10A1 2 CODE QTY FDCL 1 FDCR 1 FCC 4 FMC 4 FCB 4 RJ 4 EPS 4 CBC 1 VC 2 VCP...

Страница 7: ...B2B B2B MJ RS2B1 RS8B1 RS10A1 B22 RS4XB1 RS1XB1 DSH1 RS9B1 RS8B1 RS8B1 MJ RS9B1 RS1XB1 RS12B1 RS10A1 RS2B1 DL DR FSPA FSPA CDLA CDRA CCA CB4F CB1B CB1B CB4F CCA CMA CCA CCA CMA CMA CMA CB2B CB2B CB3XB CB3B RS5B1 RS5B1 RS5B1 RS4XB1 RS9B1 RRS1 RRS1 SP SP SP SP SP SP SP RPB1 RPB1 RPB1 RPB1 ...

Страница 8: ...ncrete patio stone squares is recommended for suitable floor base Make sure it is firm and level and will allow drainage away from the site The base foundation should be at least 4 inches 100mm larger than the shed dimensions Please refer to the front page of your owner s manual for the exterior dimensions of the shed Manufacturer is not responsible for the choice and construction of the foundatio...

Страница 9: ... bolts Qty 22Nos not provided Assembly on concrete foundation Note Measure in all direction as shown in figure to make the base channel assembly in a perfect 1 M6 Anchor Bolt Base U Channel Concrete 1 It is important that these instructions are followed step by step 2 All parts are clearly marked and care should be taken to use the correct one 3 Don t install under windy conditions 4 If you are bu...

Страница 10: ...are should be taken to use the correct one Note Fig 3 Fig 1 CDRA Fig 2 CDRA B1RB Right Back Left 1 2 3 B1RB CDRA B1LB B1RB CDRA S1 Parts Needed Code Qty CCA 4 CDLA 1 CDRA 1 CMA 4 CB1B 2 CB2B 2 CB3B 1 CB3XB 1 CB4F 2 MJ 1 FCB 4 CBC 1 SP 7 FSPA 2 S1 46 S2 4 EPS 4 ...

Страница 11: ...el on top of all panels inside Note SP 2 B1RB CDRA Fig 2 CCA B1RB B2B Fig 1 CCA SP Fig 3 CCA S1 SP S2 CCA FCB 4 Do not tighten the screw Leave it loose Note Front CDRA CCA 1 2 3 B1RB B2B 3 CCA FSPA FSPA FSPA FSPA FSPA FCB B1RB ...

Страница 12: ...Fig 3 CB4F CB1B EPS 11 S1 CB1B CDRA Fig 2 5 6 2 CB1B CDRA 1 Fig 1 CB1B S1 FCB 1 2 3 CB4F B1RB Fig 1 S1 CB4F CDRA Fig 2 S1 S1 SP CMA 7 CB4F SP B2B CMA FSPA SP CCA 2 1 Fig 1 Fig 2 B2B B1RB CDRA ...

Страница 13: ...1 CMA 9 CB2B CB1B S1 Fig 2 SP CCA 10 1 2 3 B2B B22 CCA B22 B2B CCA S1 B22 CCA SP CCA Do not tighten the S2 screw Leave it loose Note Fig 1 Fig 3 SP CMA SP SP 1 2 3 4 Fig 1 Fig 2 Fig 4 FCB Fig 1 CB2B S1 FCB Fig 2 1 2 CB2B S2 FCB CCA CMA ...

Страница 14: ...13 SP B22 1 CB3XB CB3B FCB S1 CB3B CB2B S1 CMA CB3B S1 CB3XB CBC CB3B CMA CB3XB 11 12 13 2 S1 SP CMA SP SP CCA CMA CB3B CB3XB S1 MJ CB3B Fig 1 Fig 2 3 4 1 2 Fig 1 Fig 2 Fig 3 Fig 4 CB3XB CB3B MJ CMA ...

Страница 15: ... Fig 1 Fig 2 Fig 3 Do not tighten the S2 screw Leave it loose Note 14 15 16 CB3XB CB3XB S1 CMA 1 2 SP CCA B2B B21 CCA S1 B2B CCA SP CCA 3 4 CCA FCB CCA CMA SP SP 1 2 Fig 4 Fig 2 FCB Fig 2 CB3XB S1 FCB CB3XB Fig 1 1 2 S2 B21 B21 B2B ...

Страница 16: ...CCA Fig 3 S1 B1LB CCA SP CCA 15 SP CMA S1 Fig 1 Fig 2 CMA Fig 1 3 1 2 17 18 19 SP SP SP CCA CB2B FCB S1 CB2B S1 CMA CB2B CB3XB S1 Fig 2 CB2B CMA CCA SP 2 1 Fig 1 Fig 2 Fig 3 CMA SP SP Fig 4 3 4 1 2 B2B B2B B1LB ...

Страница 17: ...en the four center band fittings FCB to the corner column CCB Note 20 21 22 CDLA B1LB S1 FSPA CDLA FSPA CDLA B1LB CDLA CB1B S1 CB2B 1 2 2 Fig 1 Fig 2 FCB S1 CB1B CB1B CDLA S1 3 CB1B Do not tighten the S2 screw Leave it loose Note CB2B 1 2 Fig 1 Fig 2 1 3 FSPA SP CCA Fig 3 S2 FCB CCA FCB ...

Страница 18: ...CDLA CB4F B1LB S1 CDLA CB4F S1 Fig 1 Fig 2 Fig 3 CB4F CB1B EPS CB4F B1LB 2 3 1 61 1 4 1556mm 17 23 24 CDRA CDLA ...

Страница 19: ...Needed Code Qty RS1XB1 4 RS2B1 4 RS3LH 2 RS4XB1 2 RS5B1 4 RS8B1 4 RS9B1 4 RS10A1 2 RS11A1 1 RS12B1 1 MJ 2 Code Qty DSH1 1 FDCL 1 FDCR 1 FCC 4 FMC 4 RJ 4 S1 101 S2 4 S7 8 CMB FMC 18 1 CMA S1 CMA FMC CMA CMA CMA 1 2 Fig 1 Fig 2 ...

Страница 20: ...FCC CCA FCC CCA S1 Fig 1 1 Fig 2 CDLA FDCL S1 CDRA FDCR S1 CDRA CDLA 2 19 2 3 CCA CCA CCA CCA 1 2 Fig 1 Fig 2 ...

Страница 21: ...ructures Assembly 20 DSH1 RS2B1 RS2B1 RS2B1 RS2B1 RS5B1 RS5B1 RS12B1 RS4XB1 RS4XB1 RS3LH RS3LH RS1XB1 RS1XB RS1XB1 RS1XB1 RS8B1 RS8B1 RS9B1 RS9B1 RS8B1 RS8B1 RS9B1 RS9B1 RS10A1 RS11A1 RS10A1 MJ MJ RS5B1 RS5B1 ...

Страница 22: ...Front roof structure assembly 21 4 6 S1 MJ RS1XB1 MJ Make sure these holes up S1 RS9B1 RS8B1 RS9B1 RS8B1 S1 RS9B1 RS8B1 RS2B1 RS8B1 RS2B1 RS9B1 5 6 RS2B1 RS1XB1 RS1XB1 RS1XB1 RS1XB1 RS1XB1 RS1XB1 ...

Страница 23: ...ck roof structure assembly 22 7 S1 MJ MJ S1 RS9B1 RS8B1 RS9B1 RS8B1 Make sure these holes up S1 RS9B1 RS8B1 RS8B1 RS2B1 RS2B1 RS9B1 RS2B1 8 9 RS1XB1 RS1XB1 RS1XB1 RS1XB1 RS1XB1 RS1XB1 RS1XB1 RS1XB1 RS1XB1 ...

Страница 24: ...ig 1 Fig 2 Fig 3 Fig 4 RS2B1 Front 23 10 10 11 CDRA CDLA RJ S1 RS3LH RJ 1 2 3 4 CDRA CDLA S1 FDCR S1 FDCL Make Two Sets Note Fig 1 Fig 2 RS3LH RJ 1 2 RS1XB1 RS1XB1 RS1XB1 RS1XB1 RS1XB1 RS1XB1 RJ S1 RS3LH ...

Страница 25: ...Back 24 12 13 Front DSH1 S1 S1 DSH1 DSH1 S1 DSH1 RS9B1 CMA FMC S1 CMA CMA RS2B1 Fig 3 Fig 1 Fig 2 1 2 3 RS2B1 RS2B1 RS9B1 RS1XB1 RS1XB1 RS1XB1 ...

Страница 26: ...RS3LH S1 FMC 25 14 15 RJ FCC S2 Fig 1 Fig 2 Fig 3 Fig 4 RJ RS1XB1 RS2B1 S1 RS3LH S1 RJ 1 2 3 4 RS3LH RS3LH ...

Страница 27: ... 2 Fig 1 Fig 2 Fig 3 1 1 2 3 Fig 1 Fig 2 Fig 3 RS10A1 S1 RS5B1 Note Make sure the hole in RS10A1 facing outward on both sides 27 19 18 RS4XB1 RS5B1 S7 RS4XB1 RS4XB1 RS5B1 RS5B1 RS4XB1 S7 RS10A1 RS5B1 RS5B1 S1 RS5B1 RS11A1 RS5B1 S1 ...

Страница 28: ...RS12B1 S1 RS5B1 RS5B1 28 20 RS5B1 RS12B1 ...

Страница 29: ...RS1 2 PPG 64 PIN 64 RS14B 8 1 FPRB1 PPG PIN Front 2 FPLB1 PPG PIN Front Back 3 PPG PIN FPRB1 Back 4 PPG PIN FPLB1 FPRB1 PPG PIN Note Use the same colour Plugs Pins PPG PIN to fix the Roof Panels Facia Panels Insert roof plugs into Facia Panel only as indicated Note ...

Страница 30: ...s into roof panels only as indicated Apply silicone around the roof plugs This is optional and should be done for heavy rain areas if needed Note 30 5 PPG PIN Front Silicone PPG 6 7 PPG PIN Back Back 8 PPG PIN Back 9 PPG PIN RRS1 10 PPG PIN RPB1 RPB1 RPB1 RPB1 ...

Страница 31: ...31 11 RRS1 PPG PIN 12 Inside View Outside View RS14B RS14B RS14B RS14B ...

Страница 32: ...E Door 32 1 2 1 2 Fig 1 Fig 2 Parts Needed Code Qty DL 1 DR 1 L 1 R 1 S2 4 Fig 1 DL DR S2 DL L R R L Fig 2 S2 R DR ...

Страница 33: ... perimeter of the base U channel Seal the corners joints and base of door column This is optional and should be done for heavy rain areas if needed Note Base U channel Silicone Column 1 2 Fig 1 Silicone Base U channel Fig 2 33 ...

Страница 34: ...VCP 4 Ventilation kits can be installed on any of the wall panels or Facia panels 4 2mm 5 32 12 5mm 1 2 Outside Note VC SP VC VCP SP SP SP 34 1 2 3 4 Follow the same steps 1 4 for installing ventilation kit on Facia panels Note VC VCP FPRB1 FPLB1 ...

Страница 35: ...rk the concrete at the holes in the base and drill concrete with 1 2 dia 12 5mm concrete bit to accept anchor bolts to a 1 3 4 44mm depth Replace base and secure with 1 4 x 1 1 2 M6 x 40mm anchor bolts M6 Anchor Bolt Base U Channel Concrete Attach each side panel SP on the bottom to the Base U channel Using a dia 3mm 1 8 drill with a power drill make two equal distance holes on the Base U channel ...

Страница 36: ...B1 The DURAMAX shed has been tested and passed wind loads of up to 115 mph in a controlled laboratory environment Natural high wind areas create wind at unpredictable speeds that are very difficult to capture accurately by location As such we cannot guarantee the performance of the shed in these extreme situations Important Warranty Information We recommend to clear snow from the Roof top after ea...

Страница 37: ...n Wood Metal on soil For heavy wind area ANCHOR KIT Concrete Eye bolt with wire rope for sheds installed with foundation Wood Metal on concrete For heavy wind area ANCHOR KIT Foundation Strap clamping for shed assembly with foundation Wood Metal on concrete To prevent shed from displacement SHELF KIT Easy mounting system on the middle column 6 inch wide reinforced PVC shelf with end caps SKY LIGHT...

Страница 38: ...U S Polymers Inc 1057 S Vail Ave Montebello CA 90640 United States of America ...

Страница 39: ...Fig 1 Fig 2 1 2 RS5B1 RS5B1 RS8B1 RS5B1 RS5B1 S1 RS8B1 RS5B1 S1 RS9B1 RS5B1 S1 RS9B1 26 16 17 S1 RS8B1 RS8B1 RS5B1 RS5B1 1 2 RS5B1 RS5B1 Fig 1 Fig 2 ...

Отзывы: