P 4
Please retain product label and instructions for future reference
For assistance please contact customer care on: 01636 880514
Mercia Garden Products Limited,
Sutton On Trent,
Newark,
Nottinghamshire,
NG23 6QN
www.merciagardenproducts.co.uk
Pre drill
hole
50mm
screw
Step 5
Parts needed - No. 2 QTY 1
No. 3 QTY 1
Place the Plain Gable
(No. 3)
and the first Plain
Side
(No. 2)
onto the floor.
Fix the corners with 50mm screws
as shown in the illustration,
making sure the gable sits inside
the panel.
Do not secure the building to the
floor until the roof is fitted.
3x50mm Screws
3
2
1
Pre drill
hole
50mm
screw
Step 6
Parts needed - No. 1 QTY 1
No. 2 QTY 1
Place the door gable
(No. 1)
and the second plain
side
(No. 2)
onto the floor.
Fix the corners with 50mm screws
as shown in the illustration,
making sure the gable sits inside
the panel.
Do not secure the building to the
floor until the roof is fitted.
9x50mm Screws
2
Step 7
Parts needed - No. 8 QTY 1
No. 22 QTY 2
Place the Ridge Bar
(No. 8)
inbetween
the gables, resting on top of the blocks.
Secure to the gables using a Corner
Brace
(No. 22)
at each end using
4x30mm screws per brace.
8x30mm Screws
Pre drill
hole
30mm
screw
8
22
Step 8
Parts needed - No. 5 QTY 2
No. 9 QTY 2
Fix an eaves frame
(No. 9)
to the
edge of each roof sheet
(No. 5)
with 4x30mm screws per
frame. Repeat the process to
create both sides of the roof.
8x30mm Screws
Pre drill
hole
30mm
screw
9
5
**If you have purchased a 7x7 Summer House with Pack B extension
then skip to step 8a**
Содержание 03BRN0705-V5
Страница 13: ...2 1 3 4...
Страница 14: ...REGISTER FOR YOUR ANTI ROT GUARANTEE TODAY PLEASE SCAN HERE 1 2...