P 3
Please retain product label and instructions for future reference
Step 2
Lay the door gable face up on a flat surface, place the door within the door aperture. Position the
door so that you have a equal gap either side of the door to the gable.
Once you are happy the door is in the correct position place a hinge at the top and bottom of the
door, ensuring the screws will go into the framing (in cases where you have been supplied three
hinges use the third in the middle of the door) and using 30mm black screws fix the hinge to the door
and the door gable. Ensure to pre-drill the holes first.
30mm Black Screw x 14
17
5
Lay the floor joists under
the floor sheet with an even
space between each one.
Position the joists flush on
one side of the floor sheet
and mark the centers of
joists onto either end . Fix
using 4 x 30mm screws per
joist.
30mm
screw
Repeat the screws positions
along each line
20 x 30mm Screws
Step 3
Place the floor on a firm
and level base, ensure
base has suitable
drainage free from areas
where standing water can
collect. (See front page
on base requirements).
6
12
3 x 50mm screws
DO NOT SECURE THE BUILDING TO
THE FLOOR UNTIL AFTER THE
ROOF HAS BEEN FITTED.
Position the panels so there are
equal gaps between the floor
and cladding
Step 4
Fix the corners with
3 x 50mm screws as in the
diagram.
Attach the Plain Gable to the Left
Window Side together with 3x50mm
screws.
2
4
6
50mm
screw
9 x 50mm screws
DO NOT SECURE THE BUILDING TO
THE FLOOR UNTIL AFTER THE
ROOF HAS BEEN FITTED.
Fix the corners with
3 x 50mm screws as in the
diagram.
Position the panels so there are
equal gaps between the floor
and cladding
Step 5
Attach the Door gable to the Right
Window Side with 50mm screws.
1
3
50mm
screw