P 4
Please retain product label and instructions for future reference
Step 6
Place the Ridge Bar in between the
front and back panels. Ensure the
framing sits ontop of the central
upright on both gables (see
illustration). Secure in place with a
screw through the gable into the
ridge bar.
2 x 30mm screws
30mm
screw
10
40mm
screw
8 x 30mm screws
18 x 40mm screws
Step 7
Fix a eaves frame to each roof sheet
using 5x30mm screws per eave.
Position the roof sheets on the
building ensuring the roof sheet
sits flush with the building at the
back and fix using 10x40mm
screws per sheet.
30mm
screw
7
11
7
14 x 50mm screws
Fix the panels to the floor
with 3x50mm screws per
panel as in the diagram.
Position the panels so there are
equal gaps between the floor
and cladding
Step 8
Fix the panels to the floor using 50mm
screws as shown in the illustration.
b
b
b
b
b
b
b
b
50mm
screw
Fit the fascia block to the front
of the building using 4x30mm
screws, make sure it is flush
with the outside edge of each
roof sheet.
30mm
screw
4 x 30mm screws
14
Step 9