0628LOG114-V4 (3x4m)

0628LOG114-V4: 3x4m 28mm log cabin 

2mm Drill bit

Winter = High Moisture = Expansion

Summer = Low Moisture = Contraction

All building’s should be 

erected by two adults

For ease of assembly, you 

MUST

 pilot drill all screw 

holes and ensure all screw 

heads are countersunk.

CAUTION

Every effort has been made during the 

manufacturing process to eliminate the 

prospect of splinters on rough surfaces of the 

timber.  You are strongly advised to wear gloves 

when working with or handling rough sawn 

timber.

Please retain product label and instructions for future reference

General Instructions

BEFORE YOU START PLEASE READ INSTRUCTIONS CAREFULLY 

- Check the pack and make sure you have all the parts listed. 

- When you are ready to start, make sure you have the right tools at hand (not supplied) 

including  a Phillips screwdriver, Stanley knife, wood saw, step ladder and drill with 2mm 

bit.

- Ensure there is plenty of space and a clean dry area for assembly. 

TIMBER

As with all natural materials, timber can be affected during various weather conditions. 

For the duration of heavy or extended periods of rain, swelling of the wood panels may 

occur. Warping of the wood may also occur during excessive dry spells due to an interior 

moisture loss. Unfortunately, these processes cannot be avoided but can be helped. It is 

suggested that the outdoor building is sprayed with water during extended periods of 

warm sunshine and sheltered as much as possible during rain or snow. 

BUILDING A BASE

When thinking about where the building and base are going to be constructed: 

Ensure that there will be access (60cm) to all sides for maintenance work and annual 

treatment.

Ensure the base is level and is built on firm ground, to prevent distortion.  Refer to 

diagrams for the base dimensions. The base should be slightly smaller than the external 

measurement of the building, i.e. The cladding should overlap the base, creating a run 

off for water. It is also recommended that the floor be at least 25mm above the 

surrounding ground level to avoid flooding.

TYPES OF BASE

- Concrete 75mm laid on top of 75mm hard-core.

- Slabs laid on 50mm of sharp sand.

Whilst all products manufactured  are made to the highest standards of Safety and in 

the case of childrens products independently tested to EN71 level, we cannot accept 

responsibility for your safety whilst erecting or using this product.

Refer to the instructions pages for your specific product code

For ease of assembly use a 

rubber mallet to fit the log 

boards. Do 

NOT

 use a heavy 

hammer.

Ensure to measure and check before cutting 

boards.

It is advisable to use a hand 

saw when cutting roof and 

floor boards.

To ensure log boards are even, use a spirit 

level to check each layer has been installed 

correctly.

For assistance please contact customer care on: 01636 821215

Mercia Garden Products Limited, 

Sutton On Trent, 

Newark, 

Nottinghamshire, 

NG23 6QN

www.merciagardenproducts.co.uk

Содержание 0628LOG114-V4

Страница 1: ...sprayed with water during extended periods of warm sunshine and sheltered as much as possible during rain or snow BUILDING A BASE When thinking about where the building and base are going to be constr...

Страница 2: ...x120x4000mm QTY 19 LB28 A 4000 Log Board 28x120x3396mm QTY 2 LB28 AE 3396 11 Log Board WA 28x120x3896mm QTY 2 LB28 AE 3896 12 Log Board WA 28x120x4396mm QTY 2 LB28 AE 4396 13 Bearer 44x44x2804mm QTY 2...

Страница 3: ...ered pattern Before securing ensure that the boards are fitted properly in their respective tongues and grooves P 3 Please retain product label and instructions for future reference Felt Tacks x600 70...

Страница 4: ...method arrange the remaining framing No 14 as shown in the illustration Ensure there is an equal amount of space between each frame Secure each of the frames in place using 2x70mm screws for each side...

Страница 5: ...No 9 QTY 6 Lay the next 6 boards No s 5 6 8 9 onto the assembly to create your second level Ensure that the boards are level and flush with each other as you lay each one Doors can be hung once the b...

Страница 6: ...st two boards No s 9 22 onto the front of the assembly Once in position place log board No 12 onto the plain sides fixing into position by screwing through the notches as shown in the illustration Ens...

Страница 7: ...Once in position fix to each purlin using 3x40mm screws Due to natural occurences of wood shrinkage expansion You maybe required to use the provided spacers and place a space of 2mm to ensure every ro...

Страница 8: ...l Continue adding the floor boards internally making sure to interlock each individual board Do NOT secure the boards until the last board has been measured and cut Measure the gap between the bottom...

Страница 9: ...al space 21 21 Pre drill hole 30mm screw trim to fit Step 15 Parts needed No 21 QTY 6 Inside the building place the closure trim No 21 against the boarding and align with the roof as shown in the illu...

Страница 10: ...ole 40mm screw Step 19 Parts needed No 20 QTY 8 Arrange the storm braces No 20 around the building internally Place 2x storm braces per side fixing into place using 2x 70mm bolts per brace making sure...

Отзывы: