Please retain product label and instructions for future reference
1!
2!
Pre drill
hole
50kg
Step 11
Parts needed - & &
Line the Support Blocks
(No.18)
up with the gable framing at
the front and back of the building, as
shown, use 5x40mm screws per
block to fix.
Place the Roof Support Bar
(
No.19
) on top of the support block
and fix in position with one Corner
Brackets (
No.31
) per end, using
4x30mm screws per brace.
8x30mm screws
10x40mm screws
30mm
screw
40mm
screw
18
19
31
A
B
A
B
18
19
31
Step 12
Parts needed - 20 &
Line the Roof bearer
(No. 20)
up with
the framing of the gable tops as shown
in the illustration.
Fix the Roof bearer
(No.20)
into position
with two Corner Brackets (
No. 31
) using
4x30mm
per bracket as shown.
Fix into position screws per bracket
8x30mm screws.
20
30mm
screw
31
1!
2!
Pre drill
hole
20
20
31
Step 13
Parts needed -
To make the Safety Rail secure,
locate the Railing Upright (
No.21
)
so that it is flush to the end of the
Safety Rail
(No.12)
and the Roof
Bearer
(No.20)
.
Fix into position by screwing
through the upright into the Safety
Rail and the Roof bearer using
3x40mm screws as shown.
3x40mm screws.
40mm
screw
21
1!
2!
Pre drill
hole
21
20
12
P 10
Please retain product label and instructions for future reference
DO NOT ALLOW YOUR CHILD TO PLAY WITH ANY
COMPONENT PARTS PRIOR TO ASSEMBLY.
Содержание 02DTSHOA08066WBF-V1-PEFC
Страница 24: ...2 1 3 4...
Страница 25: ...REGISTER FOR YOUR ANTI ROT GUARANTEE TODAY PLEASE SCAN HERE 1 2...